New Search
My WebLink
|
Help
|
About
|
Sign Out
New Search
GJN4111 End Warranty
COE
>
PW
>
Admin
>
Finance
>
Capital
>
2008
>
GJN4111 End Warranty
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
1/20/2010 2:29:20 PM
Creation date
6/27/2008 9:37:47 AM
Metadata
Fields
Template:
PW_Capital
PW_Document_Type_Capital
Warranty
PW_Active
No
External_View
No
GJN
004111
GL_Project_Number
945674
Identification_Number
End Warranty
COE_Contract_Number
2006-00005
Retention_Destruction_Date
2/27/2017
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
Page 1 of 1
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
Show annotations
View images
View plain text
Final Acceptance Public works <br /> Completion of Warranty Period Englneering <br /> 244 East Broadway <br /> Eugene, OR 97401 <br /> (541)682-5560 <br /> (541) 682-8410 <br /> To: Babb Construction Co <br /> dba Delta Construction Co Date: February 27, 2007 <br /> 99 Division Avenue <br /> Eugene, OR 97404 From: Mike Koivula <br /> Project: Debrick Rd. and Butte Ln. Improvements <br /> Contract Number: 2006-05 Job Number: 4111 <br /> A warranty inspection has been made on this project in accordance with Section 00150 of the <br /> City Standard Specifications and Standard Drawings. <br /> No defects were noted and/or were corrected the project is hereby accepted by the City for <br /> permanent maintenance. <br /> FOR PRIVATELY ENGINEERED PROJECTS ONLY <br /> ,'Engineer. <br /> Address: <br /> Owner. <br /> Address: <br /> <br /> Q: ROJECTS\PROJ-1\4111\Correspon ence\Contractors\4111-2007-02-27 Fina Acceptance MK.doc <br /> ENG 1122 Contractor File Engineer Owner Surety PW Admin Construction Manager Revised 4/04 <br /> <br />
The URL can be used to link to this page
Your browser does not support the video tag.