<br /> Final Acceptance Public Works <br /> <br /> Completion of Warranty Period Engineering <br /> 244 East Broadway <br /> Eugene, OR 97401 <br /> (541) 682-5560 <br /> (541) 682-8410 <br /> To: KSH Construction Date: March 29, 2007 <br /> P.O. Box 21431 <br /> Keizer, OR. 97307 From: Chuck Mueller <br /> Project: Bethel Path <br /> Contract Number: 2006-14 Job Number: 4101 <br /> A warranty inspection has been made on this project in accordance with Section 00150 of the <br /> City Standarci Specfications and Standard Drawings. <br /> No defects were noted and/or were corrected the project is hereby accepted by the City for <br /> permanent maintenance. <br /> 04-02-U7 AC? : 1 I is <br /> FOR PRIVATELY ENGINEERED PROJECTS ONLY <br /> Engineer. <br /> Address: <br /> Owner. <br /> Address: <br /> Q:\P OJECTS\PROJ-1\4101\Correspondence\Contractors\4101-20070329Notice of Comp etion Begin Warranty Period.doc <br /> ENG 1122 Contractor File Engineer Owner Surety PW Admin Construction Manager Revised 4/04 <br /> Finance/Accts Receivable for assessable projects or City Recorders Office for nonassessable projects <br /> <br />