New Search
My WebLink
|
Help
|
About
|
Sign Out
New Search
GJN4166 End Warranty
COE
>
PW
>
Admin
>
Finance
>
Capital
>
2008
>
GJN4166 End Warranty
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
10/18/2011 11:07:40 AM
Creation date
6/26/2008 1:28:41 PM
Metadata
Fields
Template:
PW_Capital
PW_Document_Type_Capital
Warranty
PW_Active
No
External_View
No
GJN
004166
GL_Project_Number
945225
Identification_Number
End Warranty
COE_Contract_Number
2005-00033
Retention_Destruction_Date
7/5/2017
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
Page 1 of 1
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
Show annotations
View images
View plain text
'ial Acceptance ac;-7 ? ► ► j' Public Works <br />mpletion of WarrantYPeriod Engineering <br />244 East Broadway <br />Eugene, OR 97401 <br />(541)682-5560 <br />(541)682-8410 <br />To: Mountain State Construction <br />PO Box 135 <br />Toledo, Oregon 97391 <br />Project: Division Avenue Pump Station <br />Date: July 5, 2007 <br />From: John Bonham <br />Contract Number. 2005-00220 Job Numb: ° + 166 <br />A warranty inspection has been made on this project in accordance with Section 00150 of the <br />City Standard Specifications and Standard Drawings. <br />No defects were noted and/or were corrected the project is hereby accepted by the City for <br />permanent maintenance. <br />FOR PRIVATELY ENGINEERED PROJECTS ONLY <br />Engineer. <br />Address: <br />Owner <br />Address: <br />ENG 1122 Contractor File Engineer Owner surety 4W Admin,) Construction Manager Revised 4/04 <br />FinancetA ivable for assessable projects or City Recorders ce for nonassessable projects <br />
The URL can be used to link to this page
Your browser does not support the video tag.