New Search
My WebLink
|
Help
|
About
|
Sign Out
New Search
GJN4151 CO3
COE
>
PW
>
Admin
>
Finance
>
Capital
>
2008
>
GJN4151 CO3
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
1/19/2010 4:27:45 PM
Creation date
6/26/2008 10:58:59 AM
Metadata
Fields
Template:
PW_Capital
PW_Document_Type_Capital
Contracts
PW_Active
No
External_View
No
GJN
004151
GL_Project_Number
935262
Identification_Number
2005100455
COE_Contract_Number
2005-00025
Retention_Destruction_Date
5/29/2018
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
Page 1 of 1
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
Show annotations
View images
View plain text
~t.~ ~ 10~ SS <br /> CITY OF EUGENE <br /> DEPARTMENT OF PUBLiC WORKS <br /> Job# 4151 <br /> Change Order Contraa# 2005-25 <br /> Change Order # 3 <br /> CONTRACTOR: 2G ConaWctlan Date: 12/2/2005 <br /> (ADDRESS) P.O. Box 11735 CAM Date• <br /> Eugene, OR 97440 <br /> Reviewed by: Date: <br /> InaoeGOr. A Steffen <br /> PROJECT: RiverPiav Plavaround at Skinne_ r Butte Park at 205 Cheshiro Avenue <br /> Pro . M r. ~ S. MIIoNch <br /> Prindpal Eng. M. Cahill <br /> You are directed to make the foNowing changes in this contract: <br /> contract <br /> Ibm <br /> No. <br /> 941 Install loddn screws on astom brass drain cover <br /> 871 Provide additional excavation for Ii ht le bases <br /> 372 Make additional IM tlon cha <br /> 950 Install new 3" water line for water features <br /> 980 Exchan very different size <br /> 970 Install area drain and dean out at restroom <br /> 960 Install concrete wall at access) a ram <br /> 990 Work with artlst on dlmbi rocks <br /> 1000 Work with artist on hi dl <br /> 1010 Cha a ble water Ilne size as directed <br /> 1020 Install setWrs villa e <br /> Chan a contract com letlon date to Ju 1 2006 to accommodate additonal work and wet site conditlons. <br /> This changes the bid Items as follows: <br /> Contract Contract <br /> Item Time Quantity Unk Amsndsd Net <br /> No. Item Chan s Units Cost Amount Chan a Chan e <br /> 941 Itutall loddng screws on brass drein cover Ori Ina) 0.00 0.00 0. 0. <br /> Revised 0.00 0.00 0.00 <br /> Amended 1.00 l5 529.14 29.14 529.14 <br /> 871 Excavate for fight pole bases - itlona Ina) 0.00 0. ;0•~ <br /> Revised 0.00 0.00 0.00 <br /> Amended 1.00 LS 1332.58 1332.58 1332.58 <br /> 372 Additional Irrigatlon Changes Ina 0.00 0. 0. ;0.00 <br /> Revised 0.00 0.00 0.00 <br /> Amended 1.00 l5 3 591.08 591.08 ;3 591.08 <br /> 950 Install 3" water fine with valves Ina) 0.00 0.00 .00 ;0.00 <br /> Revised 0.00 0.00 0.00 <br /> Amended 1.00 LS 6483.52 6483.52 6483.52 <br /> 960 change an return pavers Orl Ina 0.00 0• ;0.00 <br /> <br /> ~r Revised 0.00 0.00 0.00 <br /> Amended 1.00 lS 678.22 678.22 678.22 <br /> 970 Install area drain and eanout at restroom Ina 0. 0. 0. ;0.00 <br /> Revised O.OD 0.00 0.00 <br /> Amended 1.00 LS 1152.71 1152.71 1152.71 <br /> 9 Install concrete wa{ et accessi le ramp Ori ins 0.00 0.00 0.00 ;0.00 <br /> Revised 0.00 0.00 0.00 <br /> Amended 1.00 LS 751.24 ;751.24 (751.24 <br /> 990 gimbing column work with artist N ins 0.00 0. ;0.00 <br /> ReNSed 0.00 0.00 0.00 <br /> Amended 1.00 lS 16 945.90 16 945.90 S36 945.90 <br /> 1000 History dig work with artst N Ina .00 .00 50.00 <br /> Revised 0.00 0.00 0.00 <br /> Amended 1.00 LS 34 887.0 34 887.03 ;34 887.03 <br /> 1010 Change stze of potable water line Orl lna 0.00 0.00 <br /> Revised 0.00 0.00 0.00 <br /> Amended I.00 IS 244.52 244.52 244.52 <br /> 10 0 Insta i Settlers Village ins .00 0. 0. ;0.00 <br /> Revised 0.00 0.00 0.00 <br /> Amended 1.00 lS 35 619.42 15 619.42 15 619.42 <br /> The origins{ contract work days are D.o da <br /> The contract time change this C.O 0.0 da <br /> The contract time change by previous C.O.'s o.o da e <br /> The new contract work da s are o.o da <br /> The original contract sum was ;597.322.25 <br /> Net change by previous change order 32,o42.1e <br /> Net change due to amendment by previous change order , , 517,Sao.E7 <br /> The contract sum prior to this change order was 3s1e.9o5.2e <br /> This change order will change contract sum by this amount , , ;82,215.38 <br /> The new contract net change sum 32,oa2.ts <br /> The new contract amendment sum 399.758.23 <br /> The new contract sum Including this change order will be 3s99.12o.ea <br /> Percents a of on final contract 17.oa~ <br /> NET CNAN E UE A N 16.70 <br /> Appr val by <br /> t ~ ~ ~ ~w <br /> City Engineer Pri Con ctor Third Party <br /> L? /7 fl~~ ~5 <br /> Date Date Date <br /> CONTRACTOR ~ OFFICE FILE ~ PURCHASINCi/CRO <br /> <br />
The URL can be used to link to this page
Your browser does not support the video tag.