New Search
My WebLink
|
Help
|
About
|
Sign Out
New Search
GJN4151 Begin Warranty
COE
>
PW
>
Admin
>
Finance
>
Capital
>
2008
>
GJN4151 Begin Warranty
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
1/19/2010 4:27:45 PM
Creation date
6/26/2008 10:49:30 AM
Metadata
Fields
Template:
PW_Capital
PW_Document_Type_Capital
Warranty
PW_Active
No
External_View
No
GJN
004151
GL_Project_Number
935262
Identification_Number
Begin Warranty
COE_Contract_Number
2005-00025
Retention_Destruction_Date
5/29/2018
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
Page 1 of 1
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
Show annotations
View images
View plain text
Notification of Commencement and <br /> Public Works <br /> Completion Dates for Contract Projects Engineering <br /> <br /> iL Ciry of Eugene <br /> 244 E. Broadway <br /> Eugene, OR 97401 <br /> (541) 682-5560 <br /> DATE CONTRACT NO. <br /> 11 /1 /2006 2005-00025 <br /> PROJECT NAME JOB NO. <br /> Fiver Play 4151 <br /> CONTRACTOR FEDERAL AID PROJECT NO. <br /> ~G Construction, Inc. n/a <br /> INSPECTOR PHONE NUMBER DATE OF AWARD <br /> Adam Steffen 682-5040 5/23/2005 <br /> FIRST NOTIFICATION <br /> 616/2005 IS THE DATE ON WHICH THE CONTRACT WORK BEGAN. Inspector Signature <br /> SECOND NOTIFICATION <br /> SPECIFIED COMPLETION DATE (Sj (FROM SECT. 00180.50) DAYS CHARGED DATE (S) THE WORK WAS SUBSTANTIALLY <br /> BEYOND SPECIFIED COMPLETED & THE TIME CHARGES STOPPED. <br /> COMPLETION <br /> 0 7/8/2006 <br /> VLL CLAIMS FOR ADDTi10NAL COMPENSATION MUST BE SUBMITTED BY: <br /> SEE SUBSECTION 00199.30 OF THE CONTRACT PROVISIONS FOR ADDITIONAL REQUIREMENTS.) <br /> ' Inspector Signature <br /> tHIRD NOTIFICATION <br /> Notice of Completion. Begin Warranty Period. <br /> 8/15/2006 IS THE DATE ON WHICH ALL CONTRACT WORK WAS COMPLETED, INCLUDING CORRECTIVE WORK, EQUIPMENT AND <br /> PLANT REMOVAL, SITE CLEANUP, AND PROJECT MANAGER'S RECEIPT OF ALL CERTIFICATIONS, BILLS AND OTHER DOCUMENTS <br /> REQUIRED UNDER THE CONTRACT. THIRD NOTIFICATION INITIATES THE START OF THE ONE YEAR WARRANTY PERIOD. <br /> IN ACCORDANCE WITH SECTION 00170 OF THE STANDARD SPECIFICATIONS AND CITY AMENDMENT #1, ALL WORK IS GUARANTEED BY THE <br /> CONTRACTOR FOR ONE YEAR FOLLOWING THE DATE OF THE CITY'S NOTICE OF WORK COMPLETION. MANUFACTURE WARRANTIES <br /> BtEMAIN IN EFFECT FOR THE DURATION OF THE EXPRESSED LENGTH OF THE WARRANTY IF GREATER THAN THE REQUIRED ONE YEAR. <br /> THE CONTRACTOR IS RESPONSIBLE FOR REPAIRS OR REPLACEMENTS MADE NECESSARY BY DEFECTS IN WORK T BECOME EVIDENT <br /> Wfl'HIN THE ONE-YEAR WARRANTY PERIOD. REPAIRS OR REPLACEMENTS MADE W ITHIN THE ONE-YEA PERIOD WILL BE <br /> REQUIRED TO BE GUARANTEED FOR ONE YEAR FROM DATE OF ACCEPTANCE OF THE REPAIR. ~ <br /> Signature <br /> Far Privately Engineered Projects Only <br /> Engineer: <br /> 'Address: <br /> Owner: <br /> Address: <br /> ISTRIBUTION FOR FIRST, SECOND, AND THIRD NOTIFICATION: <br /> Contractor Engineer Owner Construction Manager File <br /> ADDITIONAL DISTRIBUTION FOR THIRD NOTIFICATION: <br /> Maintenance-Planning Surety PW Administration PIC Engineering PWE As Construct Monitor MADD Supervisor Inspector <br /> Q:\PROJECTS\PROJā¢1\4151\Correspondence\Contractors\First Second Third Notification #3,doc APRIL 2004 <br /> <br />
The URL can be used to link to this page
Your browser does not support the video tag.