New Search
My WebLink
|
Help
|
About
|
Sign Out
New Search
GJN4296 Begin Warranty
COE
>
PW
>
Admin
>
Finance
>
Capital
>
2008
>
GJN4296 Begin Warranty
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
10/18/2011 1:08:30 PM
Creation date
6/19/2008 1:25:26 PM
Metadata
Fields
Template:
PW_Capital
PW_Document_Type_Capital
Warranty
PW_Active
No
External_View
No
GJN
004296
GL_Project_Number
965062
Identification_Number
Begin Warranty
COE_Contract_Number
2006-00001
Retention_Destruction_Date
10/18/2015
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
Page 1 of 1
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
Show annotations
View images
View plain text
Notification of Commencement and <br /> Public Works <br /> Completion Dates for Contract Projects Engineering <br /> City of Eugene <br /> 244 E. Broadway <br /> Eugene, OR 97401 <br /> (541)682-5560 <br /> DATE CONTRACT NO. <br /> 9121105 2006-01 <br /> PROJECT NAME JOB NO. <br /> Eugene Airport 2005 Pavement Rehabilitation 4286 <br /> CONTRACTOR FEDERAL AID PROJECT NO. <br /> Wildish Construction, Inc. 3-41-0018-35 <br /> INSPECTOR PHONE NUMBER DATE OF AWARD <br /> ,John Casto 682-8473 Ju 15 2005 <br /> FlRST NOTIFICATION <br /> August 8, 2005 IS THE DATE ON WHICH THE CONTRACT WORK BEGAN. Inspector Signature <br /> SECOND NOTIFICATION <br /> SPECIFIED COMPLETION DATE (S) DAYS CHARGED DATE (S) THE WORK WAS SUBSTANTIALLY <br /> BEYOND SPECIFIED COMPLETED 8 THE TIME CHARGES STOPPED. <br /> COMPLETION <br /> 8/30/2005 0 8J19/2005 <br /> ALL CLAIMS FOR ADDITIONAL COMPENSATION MUST BE SUBMITTED BY: September 15, 2005 <br /> Inspector Signature <br /> THIRD NOTIFICATION <br /> Notice of Completion. Begin Warranty Period. <br /> AUIGUST 29, 2005 IS THE DATE ON WHICH ALL CONTRACT WORK WAS COMPLETED, INCLUDING CORRECTIVE WORK, EQUIPMENT AND <br /> PLANT REMOVAL, SITE CLEANUP, AND PROJECT MANAGER'S RECEIPT OF ALL CERTIFICATIONS, BILLS AND OTHER DOCUMENTS <br /> REQUIRED UNDER THE CONTRACT. THIRD NOTIFICATION INITIATES THE START OF THE ONE YEAR WARRANTY PERIOD. <br /> ALL WORK IS GUARANTEED BY THE CONTRACTOR FOR ONE YEAR FOLLOWING THE DATE OF THE CITY'S NOTICE OF WORK COMPLETION. <br /> MANUFACTURE WARRANTIES REMAIN IN EFFECT FOR THE DURATION OF THE EXPRESSED LENGTH OF THE WARRANTY IF GREATER THAN <br /> THE REQUIRED ONE YEAR. THE CONTRACTOR IS RESPONSIBLE FOR REPAIRS OR REPLACEMENTS MADE NECE Y BY DEFECTS IN <br /> WORK THAT BECOME EVIDENT WITHIN THE ONE-YEAR WARRANTY PERIOD. REPAIRS OR REPLACEME S I E ONE-YEAR <br /> WARRANTY PERIOD WILL BE REQUIRED TO BE GUARANTEED FOR ONE YEAR FROM DATE OF ACCEPT AIR. <br /> nspector Signature <br /> For Privately Engineered Projects Only <br /> Engineer. <br /> Address: <br /> Owner: <br /> Address: <br /> DISTRIBUTION FOR FIRST, SECOND, AND THIRD NOTIFICATION: <br /> Contractor Engineer Owner Construction Manager Flle <br /> ADDITIONAL DISTRIBUTION FOR THIRD N N: <br /> Maintenance-Planning Surety PW m n PIC Engineering PWE As Constnkt Monitor MADD Supervisor Inspector <br /> <br /> Q:\PROJECTS\PROJ-6\4296\Correspondence\Contractors\4296 20050825 Third notlflcatlon .doc APRiL 2004 <br /> <br />
The URL can be used to link to this page
Your browser does not support the video tag.