New Search
My WebLink
|
Help
|
About
|
Sign Out
New Search
GJN4310 CO4
COE
>
PW
>
Admin
>
Finance
>
Capital
>
2008
>
GJN4310 CO4
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
10/18/2011 1:13:43 PM
Creation date
6/19/2008 11:30:25 AM
Metadata
Fields
Template:
PW_Capital
PW_Document_Type_Capital
Contracts
PW_Active
No
External_View
No
GJN
004310
GL_Project_Number
955684
Identification_Number
2005100465
COE_Contract_Number
2005-00029
Retention_Destruction_Date
10/13/2016
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
Page 1 of 1
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
Show annotations
View images
View plain text
10/06/2005 11:2 F 541 662 6030 CITY EUGENE PW ENG a 2G CONSTRUCTION 0 001/001 <br /> CITY OF EUGENE <br /> DEPARTMENT OF PUBLIC WORKS <br /> ENGINEERING DIVISION <br /> Change Order JObrt 4370 <br /> Contract # 2005.29 <br /> CONTRACTOR: 2G Inc, dba 2G Construction Change Orders 4 <br /> t7191rv1ng Road Date' oet1B120 <br /> P.O. BOX 11795 CAMS Oete' <br /> Eugene, OR 97440 <br /> Reviewed by' Date'. <br /> PROJECT: West Univereity Neighborhood Allelre: 5 6 18. 13, 18, 20, 21, 23, 29 3 32 Inspector: Glen A. Fae <br /> at A various locat;ane in the area 9enerelly bounded by W;tlamatte St„ 19th Constr. M r. Pai a Dick'nson <br /> Avenue, Kineald Street and Franklin Boulevard Proi. Mar. Steve Gsuuo _ <br /> Principal Eng. Paul KIOOe <br /> You are directed to make the fotlovving changes in this contract: <br /> Contract <br /> Itatn <br /> No, <br /> at35 Alle aR19 Contractor Is directed to excavate an additional a' 01 ravel transition area alen tax tots 17099233 statOD & Md200. <br /> 6e1 Alie i~20 Contractor is directed to remove additional concrete arki tre sillon area et 1544 Patterson and race to site <br /> b rice a reemeni 013705,00. Concrete arkln r lecement to be id under bid Item ip0740. Memo 20-20 <br /> 7a1 Alle #20 Contractor is direotetl l0 install 47 LF of extruded concrete et tax lots X7033233 #480D 8 #5401. <br /> work to be done b rice a raemsnt 019432.00 Mama 2b•2t . <br /> 77 Alle dt20 Contractor Is directed to extend two 3" PVC i stn concrete ark;n .slab to drain to ally . <br /> Work to be done b rce a reement of 5120.00 Memo 20-22 . <br /> <br /> ~78 Alle s20 Stantlb time for unknown uUli in conflict with deli n tads. <br /> 951 Ally !21 Contractor;s directed to excavate additional 8'x42' ccncreta trensitlon area, <br /> This changes the bid items as follows: <br /> Contract contract <br /> Item Tlme Quantity Unlt Amended Net <br /> No. Item Chan a (Units Cost Amount +J-) Chan a Change <br /> 485 Transition Excavation 0 Ori final 0.00 D.00 0.00 $0,00 <br /> Revised O.DO. 40.00 0.00 <br /> Amended 1.00 L5 657.82 657.82 657.82 <br /> 661 Concrete Removal 0 Or1 Ina! 0.00 0.00 .00 ;0.00 <br /> Revised O.OD ' D.00 0.00 <br /> Amended 1.00 LS 5705.00 705.00 705.00 <br /> 741 rycttvded concrete curb 0 Ori final 0.00 , D.00 .00 $0,00 <br /> Revised 0.00 ~ .00 0.00 <br /> Amended 1.00 LS 5432.00 432.00 5432.D0 <br /> 771, Pipe Drains 0 Orf final O.DO ' 0.00 .00 $0.00 <br /> Revised 0,00 0.00 0.00 <br /> Amended 1.OOILS 120.00 5320.00 3120.00 <br /> 781 Standby Time 0 Ori final 0.00 .00 .00 ;0.00 <br /> Revised 0.00 ' .00 .00 <br /> Amended 1.OD LS 5206.89 206.89 $206.89 <br /> 851 Concrete Removal 0 ON Ina! 0.00 , 0.00 .00 50.00 <br /> Revised 0.00 .00 .00 <br /> Amended 1.OD LS 5678.76 4678.76 3678.76 <br /> The original contract work days are o.o da a RECEIVED <br /> The contract time change this C.O. o.o da s <br /> the contract time change by previous C.O.'s D.D da a QCT Q 6 2~~5 <br /> The new contred work da s are a.o da <br /> The original contrect sum was 5370,333.81 <br /> Net change by previous change order SD.oo <br /> Net chap a due to amendment b revious chan a order~~~~~~~~~~ <br /> 9 Y P g !6.596.66 <br /> The contrail sum prior to this change order was 3376,830.7 <br /> This change order will change contract sum by this amount az,eoo.a7 <br /> The new contract net change sum ~,,,,,.~„y,,....~~..~...,W--..~,,.,.µ.....~~~'_... so.oo <br /> The new contract amendment sum _ 59,397. t3 <br /> The new contract sum including this change order vriliNbe~~-~~~~~~~~~~~~~~~~~~~~~~~•„ s379.730.94 <br /> Percents a of on final contract . <br /> HET C ANGE oue To AMENDMENTS r.--- 2.5a% <br /> Approval by: <br /> City ngtneer Prime Contrailo ~ Third Party <br /> ~G~~GY ~0 ~ I t I D <br /> Date Date Date <br /> O CONTRACTOR ~ OFFICE FILE ~ PURCI1ASING/CRO <br /> QIFORMStPROJECTCONSTREVISEb CHANGE ORDER.XLS <br /> <br />
The URL can be used to link to this page
Your browser does not support the video tag.