New Search
My WebLink
|
Help
|
About
|
Sign Out
New Search
GJN4309 CO4
COE
>
PW
>
Admin
>
Finance
>
Capital
>
2008
>
GJN4309 CO4
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
10/18/2011 1:12:56 PM
Creation date
6/19/2008 11:02:20 AM
Metadata
Fields
Template:
PW_Capital
PW_Document_Type_Capital
Contracts
PW_Active
No
External_View
No
GJN
004309
GL_Project_Number
955674
Identification_Number
2005100462
COE_Contract_Number
2005-00028
Retention_Destruction_Date
10/10/2015
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
Page 1 of 1
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
Show annotations
View images
View plain text
~ CITY OF EUGENE <br /> DEPARTMENT OF PUBLIC WORKS <br /> ENGINEERING DIVISION <br /> Change Order Job # x309 <br /> Contract # 2005-28 <br /> CONTRACTOR: Brown Contracting Inc. Change Order # 4 <br /> (ADDRESS) P.O. Box 26439 Date: 08!26/05 <br /> Eugene, OR 97402 CAMS Date: <br /> Reviewed by: Date: <br /> PROJECT: West University Neighborhood Alleys:#4, #9, #14, #24 ,#26, #27, and #30 at Inspector. M. Koivula <br /> 8 various location in the area generally bounded by Willamette Street, 19th Construction M r P. Dickinson <br /> Avenue, Kincaid Street, and Frenklin Boulevard Proj. Mgr. S. Gallu <br /> Principal Eng. P. Kloae <br /> You are directed to make the following changes in this contract: <br /> Contrast <br /> Itsm <br /> No. <br /> 551 le 14 -remove existin from base of existin CIP W W mh to facilitate SD line re it <br /> 972 le 26 -install new catch basin in close roxim' to existin abandoned catch basin not shown on tans <br /> 774 Alle 24 -remove transition area 314-0 and re lace with loam and seed <br /> 1181 Aile 27 - R rede transition area and remove ex rtions of slum <br /> 1182 Alle 27 -remove and reset ed a of alle forms to better conform with existin surtaces north end <br /> 973 Alle 26 -Install 4" drain line to serve rivate ro owner at north end of ro'ect east side <br /> <br /> _ Contractor has been ranted 3 work da for hale III work on alle s #4 #9 #14 #24 #26 and #30. <br /> This changes the bid items as follows: <br /> Contract Contract <br /> Item Time Quantity Unit Amended Net <br /> No. Item Change (Units) Cost Amount Chan a Chan e <br /> 551 AI 14 remove QP base for WW MH Ori final 0.00 ~ 0.00 0.00 $0.00 <br /> to fadlitate storm drain line re it 0 Revised 0.00 ~ 0.00 0.00 <br /> Amended 1.00 t $149.34 $149.34 $149.34 <br /> 972 All Z6 install ds dose to existin Ort anal 0.00 ; 0.00 0.00 $0.00 <br /> abandoned cb 0 Revised 0.00 I 0.00 .00 <br /> Amended 1.OD I $198.72 $198.72 $198.72 <br /> 774 All 24 remove 3 4"-0" transition area Ori final 0.00 I 0.00 D.00 $0.00 <br /> re lace with loam and seed 0 Revised 0.00 ~ 0.00 0.00 <br /> Amended 1.00 ; $304.63 $304.63 $304.63 <br /> 1181 All 27 rode transition area Ori final 0.00 ; 0.00 0.00 $0.00 <br /> and remover ex rtions of stem 0 Revised 0.00 ; .00 0.00 <br /> Amended 1.00 ~ $242.70 $242.70 $242.70 <br /> 1182 All 27 reset conc forms Ori final 0.00 ; 0.00 0.00 $0.00 <br /> north end 0 Revised 0.00 I 0.00 0.00 <br /> Amended 1.00 $43.16 $43.16 $43.16 <br /> 973 All 26 Install 4" for ate Ori final 0.00 .00 0.00 $0.00 <br /> landowner north end 0 Revised 0.00 I 0.00 0.00 <br /> Amended 1.00 ; $973.93 $973.93 $973.93 <br /> The origina! contract work days are D.o da <br /> The contract time change this C.O o.o da , <br /> The contract time change by previous C.O.'s 3.o da <br /> The new contract work da are 3.o da <br /> The original contract sum was $31o,29a.oo <br /> Net change by previous change order (31,$00.00) <br /> Net change due to amendment by previous change order 39,73a.5a <br /> The ~rttract sum prior to this change order was 5318,228.5a <br /> This change order will change contract sum by this amount 31.912.x8 <br /> The new contract net change sum (31,SOO.oO) <br /> The new contract amendment sum 311,647.02 <br /> The new contract sum including this change order will be 332o,1a1.o2 <br /> Percents a of on final contract 3.17% <br /> N <br /> Approval by: <br /> Gty ngineer / { Prime "tractor Third Party <br /> ate Date Date <br /> CONTRACTOR ? OFFICE FILE ? PURCHASING/CRO <br /> Q\FORMS\PROJECT\CONST\REVISED CHANGE ORDER.XLS <br /> <br />
The URL can be used to link to this page
Your browser does not support the video tag.