Final Acceptance Public Works <br /> Completion of Warranty Period Engineering <br /> 244 East Broadway <br /> Eugene, OR 97401 <br /> (541) 682-5560 <br /> (541) 682-8410 <br /> To: Brown Contracting Date: November 9, 2007 <br /> Adam Hughes <br /> P.O. Box 26439 From: Charley Perini <br /> Eugene, OR 97402 <br /> Project: Pedistrian Crossings <br /> Contract Number: 2006-25 Job Number: 4312 <br /> A warranty inspection has been made on this project in accordance with Section 00150 of the <br /> City Standard Specfications and Standard Drawings. <br /> No defects were noted and/or were corrected the project is hereby accepted by the City for <br /> permanent maintenance. <br /> FOR PRIVATELY ENGINEERED PROJECTS ONLY <br /> Engineer. <br /> Address: <br /> Owner. <br /> Address: <br /> <br /> Q:\PROJECTS\PROJ-2\4312 ped crossings\Correspondence\Contractors\Final Acceptance Completion of Warranty Period.doc <br /> ENG 1122 Contractor Fiie Engineer Owner Surety PW Admin Construction Manager ~ Revised 4/0 <br /> Finance/Accts Receivable for assessable projects or City Recorders Office for nonassessable projects <br /> <br />