New Search
My WebLink
|
Help
|
About
|
Sign Out
New Search
GJN4311 CO1
COE
>
PW
>
Admin
>
Finance
>
Capital
>
2008
>
GJN4311 CO1
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
10/18/2011 1:14:25 PM
Creation date
6/18/2008 3:29:34 PM
Metadata
Fields
Template:
PW_Capital
PW_Document_Type_Capital
Contracts
PW_Active
No
External_View
No
GJN
004311
GL_Project_Number
955634
Identification_Number
2007100304
COE_Contract_Number
2007-00015
Retention_Destruction_Date
11/2/2017
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
Page 1 of 1
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
Show annotations
View images
View plain text
CITY OF EUGENE <br /> DEPARTMENT OF PUBLIC WORKS <br /> ENGINEERING DIVISION <br /> Change Order Job# 4311 <br /> COMrett # 2007-15 <br /> CONTRACTOR: Wildiah Construction Co. Change Order # 1 <br /> (ADDRESS) P.O. Box 7428 Dale: 03129/07 <br /> Eugene, OR 97401 CAMS Date: <br /> Reviewed by: Date: <br /> PROJECT: Glenwacd Boulevard Extension al Judkins Point south Inspector. R. Foss <br /> interchange on Interstate 5 <br /> Proj. Mgr. T. Higoins <br /> Prlncipet Enp. M. Cahill <br /> You are directed to make the following changes in this contract: <br /> Contrail <br /> <br /> item <br /> No. <br /> t t0 Decreasi this Ana due to the additional im ort stone embankment item. <br /> 600 Im Stone Embankment <br /> The Contrador Devalo er and C a ree to the followin <br /> The Contractor will clear antl rub the area at the bottom of the bas(n around storm outlet 71808. The ciead tlebria and strl in swill be hauled ofisite. <br /> As directed b the Ci or the bevel er's Geotechnical En sneer the contractor will remove additional unsuitable soils and ma lace those materials <br /> within the work limits. As dlrts3ed the O tx the bevel is Geotechnical En sneer the contrador shall lace fabHc at the contrail <br /> unit rice and then shall im rt B inch stone embankment material to stabilize the lower areas around the toe of slo .The Im art atone embankment <br /> will be laced as directed b the Ci or the bevel is Geotechnkal En sneer, A roximatel 1850 tons is estimated at a unit wst of 520.00 er ton. <br /> The a read unit wal r ton includes the condl8on that the Contractor can dis se of excess material on the ad scent site owned b the devel er. The <br /> Devalo er Is res onsible for aecurln all ermits re ulred for this All. H the Devalo er fails to obtain the necessa erm(is at the time of excavation the <br /> Contractor will be entitled to a fair un(t rice cha a order to dis se of the material offalle. All erosion control measures re wired as a result of the stock sled excess <br /> material will be the res nslbilit of the Devalo er under the ad scent PEPI ermit. The actual uantit old will I>a measured b the truck ticket indicatin tons . <br /> This Chan a order does net mods en other "Lum Sum" bid items. <br /> This changes the bid items as follows: <br /> Contract Contract <br /> Item Time Quantity Unit Amended Net <br /> No. Item Change Units) Cost Amount (~l-) Chan a Change <br /> 110 Subgrede Stablllza0on 0 Inal 800.00 CY 35.00 28 000.00 (57,000.00) <br /> Revised 600.00 CY 35.00 21000.00 <br /> Amended 0.00 0.00 0.00 0.00 <br /> Ors Inal 0.00 0.00 0.00 ;0.00 <br /> Revised 0.00 0.00 0.00 <br /> 800 Im ort Stone Embankment 0 Amended 1850.00 TN 20.00 S37 000.00 S37 000.00 <br /> Ors final 0.00 0.00 0.00 ;0.00 <br /> Revised 0.00 0.00 0.00 <br /> Amended 0.00 ;0.00 0.00 ;0.00 <br /> Ors Inal 0.00 0.00 0.00 f0,00 <br /> Revised 0.00 0.00 0.00 <br /> Amended 0.00 ;0.00 50.00 50.00 <br /> Orl anal 0.00 0.00 0.00 $0,00 <br /> Revised 0.00 0.00 0.00 <br /> Amended 0.00 50.00 f0.00 50.00 <br /> 0 anal 0.00 0.00 0.00 ;0.00 <br /> Revised 0.00 0.00 0.00 <br /> Amended 0.00 50.00 50.00 50.00 <br /> The original contract work days are g.o da <br /> The contract time change this C.O 0.0 da <br /> The contract time change by previous C.O: s o.o da <br /> The new contract work da s are o.o de s <br /> The original contract sum was Ss52,as9.oo <br /> Net change by previous change order SO.oo <br /> Net change due to amendment by previous change order So.oo <br /> The contract sum prior to this change order was 5852,469.00 <br /> This change order will change contract sum by this amount 530,000.00 <br /> The new contract net change sum (57,000,00) <br /> The new contract amendment sum S37,oo0.00 <br /> ........................................._......_._...~.__w_._......................... <br /> The new contract sum including this change order will be E882,a69,o0 <br /> Peroenta a of oil lnal contreCt _ 3.52% <br /> e <br /> NET CHANGE DUE O AMENDMENTS 4.34 /e <br /> Appro I by: 11`'1 I <br /> ngineer Pf~ t ctor Thi Party ~rK~t/Df/ <br /> ~~~,~a ~ 07 y~31~1 t:c~ <br /> Date Da Dat~r- <br /> CONTRACTOR ~ OFFICE FILE ~ PURCHASING/CRO <br /> QIFORMS\PROJECTCONSTREVISED CHANGE ORDER.XLS <br /> <br />
The URL can be used to link to this page
Your browser does not support the video tag.