. . . nn . vva ww ~1 ~ ~ LVULNI. r rt cnu lgJ VV IJUV I <br /> 'i. <br /> a <br /> ' CITY OF EUC3LNE <br /> dEPARTMENT OF PUBLIC WORKS <br /> Job # 4320 <br /> Change Order Contrad s 2006.20 <br /> Change Order N 1 <br /> CONTRACTOR: ICE Construction Date: 6128106 <br /> (AODRE55y P.O. Box 4201 GAMS Dale: <br /> uaeno.4R 740a _T' <br /> Ravlewed by: Dade: <br /> Inspsctnr: Ray Remmers <br /> PROJECT: prewar Park R9navation at 1820 Brewer Avenue <br /> Pro . M r. E. Praudfopt <br /> Prtndpal Fsg_ M. Cshill <br /> You are directed to make the following Ch2inges in this contract: <br /> Contract <br /> tt.~, <br /> Np. <br /> 420 Excavate and remove additional de th of wncrata <br /> 430 d holdouts for h~tura art work. <br /> This changes the bid items as follows: <br /> Contract Contract <br /> Item Tlmo Quantity Unit Amended Net <br /> Item Chan a (Units) Cost Amount ~ Chan a Cha e <br /> cave a and remove ad iGonal ep concrete Inal . 0 .00 <br /> Revised 0. ~ .0 <br /> d 780.00 <br /> 4 oldou s n concrete for tore art worts. ' 'nal D.00 <br /> Revised 0. .00 0.00 <br /> Atlteil 1.00 LS 5300.00 S ;300.00 <br /> na ~ 0. ;0. <br /> t 0. 0 <br /> n • LS ; . D ;0.00 <br /> Inpl 0.00 0. 0 0.00 .00 <br /> 0. <br /> LS ; . 0. ;0.00 <br /> roil 0.00 S . .00 <br /> Revised 0.00 0. 0. <br /> AMM 0.00 IS 50.00 0. ;0.00 <br /> na 0. 0 0. .00 <br /> . 0 0.00 <br /> i!d l.S ;0. 0.00 <br /> I I 0.00 .00 0. 0.00 <br /> 10.00 <br /> 0. 0. . <br /> Revised 0.00 0.00 0.00 <br /> Ante .00 l.5 ;0.00 10.00 50.00 <br /> na f0. 0 <br /> 0.00 <br /> .oD so.oo <br /> n S0. <br /> .00 0.00 0.00 0.00 _ <br /> Ina 0. ;0.00 <br /> Revised 0.00 0.00 <br /> A 0. L .00 50.00 <br /> <br /> The txiglnai centred days are O.D da <br /> The contract time Change this C.Q 0.0 da <br /> The contract time change by previous C.O.'s 0.o da <br /> TF~a nm,u nnniro~i ~u~r{r riouc ~?o Art de,ro <br /> <br />