STREET LIGHT CONSTRUCTION NOTICE <br /> AGENCY: EWEB DRAWING <br /> EWEB MAP E-10S <br /> DATE: September 18, 2006 <br /> City of Eugene-PWM (Maintenance) <br /> City of Eugene-PWE (Capital& PEPI) X <br /> These plans are outlined below and shown on the attached drawing: <br /> EWEB CONSTRUCTION PLANS <br /> GREENHILL TRIBUTARY PATHWAY -Project 4349 -Donohoe Ave. & Sophia PI. <br /> Developer's Name: City of Eugene Eugene Water & Electric Board <br /> Telephone #:Jenifer Willer 682-5364 <br /> COE Rep's Name: Randal Dale Prepared By: Katie Marwitz <br /> Telephone 682-4961 Telephone 682-8135 <br /> PO Good Job # 4349 <br /> REPLY <br /> Eugene Water & Electric Board <br /> Attention: Debbie Crampton <br /> Electric Distribution Supervisor <br /> (2x$3.15=$6.30) <br /> 1. Add 2-70W high pressure sodium street lights as per attached drawing and bill $6.30/month as per <br /> EWEB J-4 street light schedule. <br /> Preliminary billing is as follows: <br /> EWEB to bill Developer for the following work: <br /> Ditch: $ <br /> Duct: $ <br /> Other: $ <br /> Transfer: $ <br /> New Installation or connect/disconnect in same box: $ <br /> Total: $ <br /> Agency: ~ I ~ ~ ~ ~ UC ~ y1 e ~ ~~/~I Eugene Water & Electric Board <br /> <br /> Authorized by: _ By: <br /> 8-15-03 09-22-Ob AOb : 10 I N <br /> Q:\PROJECTS\PROJ-9\4349\Correspondence\Contractors\4349 20060906 KMStreetLightConstNtc.doc <br /> <br />