<br /> i <br /> CITY OF EUGENE <br /> DEPARTMENT OF PUBLIC WORKS <br /> ENGINEERING DIVISION <br /> Change Order Job# 4343/4353/4355 <br /> Contrail # 2008.30 <br /> CONTRACTOR: Wildish Construction Chanpa Order # 2 <br /> (ADDRESS) P.O. Box 7428 Date: 11/14/2006 <br /> Eugene, OR 97401-0428 CAMS Date: <br /> Rev(ewed b . Date: <br /> PROJECT: 2008 PPP on Garfield, AAhur, Seneca and Washlnpton Inspector. D. eubell <br /> -.Cawisar <br /> Prof. Mpr. M.Rodriguea <br /> Principal Enp. P.Klooe <br /> You are directed to make the following changes In this contract: <br /> Contract <br /> Item <br /> No. <br /> 680 Remove and lu 36" conaete f Seneca <br /> 69D Ramava hat Arthur <br /> 700 Remove as hal Seneca <br /> 710 ust wash water clesn Washln bon <br /> This changes the bid items as follows: <br /> Contract Contract <br /> Item Time Quantity Unit Amended Net <br /> No. Item Chan a Unitsl Cost Amount Chan a Chan e <br /> NV~ C~ 4353 on Inal D.DO o.oo .oo so.oD <br /> Revised 0.00 .00 0.00 <br /> 680 Remove and u 36'rnncrete Seneca Amended 1.00 LS 5222.16 222.16 ;222.16 <br /> rl' Orl anal 0.00 0.00 .00 ;0.00 <br /> 6'1 tt 1' tt~' ReNSed 0.00 0.00 .DO <br /> 690 Rertavea ha ArUwr ~^4 ~~"t.7 Amended 1.00 LS 15948.12 15448.12 ;15448.12 <br /> N ~ Orl anal 0.00 .00 .00 50.00 <br /> 700 Remove as en, senate <br /> 43~j,3 Amended 1.00 LS ;767.18 767.8 ;767.18 <br /> C-t.J X1355 Orf anal D.oo .DO .oo so.oo <br /> Revised 0.00 0.00 0.00 <br /> ~tltf ust wastewater dean ou Washin Amended 1.00 LS 361.00 ;361.00 ;361.D0 <br /> Ori Inal 0.00 0.00 0.00 80.00 <br /> Revised 0.00 0,00 0.00 <br /> Amended 0.00 0.00 0.00 ;0.00 <br /> OH Inal 0.00 .DO .00 ;0.00 <br /> Revised 0.00 .00 .00 <br /> Amended 0.00 .OD 0.00 ;0.00 <br /> Ori anal 0.00 .00 .00 ;0.00 <br /> Revised 0.00 0.00 0.00 <br /> Amended 0.00 ;0,00 .00 ;0.00 <br /> Ori final 0.00 O.DO 0.00 ;0.00 <br /> Revised 0.00 0.00 .DD <br /> Amended D.00 ;0,00 ;0.00 ;0.00 <br /> The original contract work days are 0.0 da <br /> The contract time change this C.O 0.0 da <br /> The contract Ume change by previous C.p.'s o.o da <br /> The new contract work da s are 0.0 da <br /> The original contract sum was <br /> Net change by previous change order 5515.1fD.oo <br /> Net change due to amendment by previous change order 521,106.08 <br /> The contract sum prior to this change order was <br /> ______......_.._.......-_.---.„._..._w.._._._._.__~__.._„__..........._.__..._.__.m.__.... (538294.18 <br /> Thfs change order will change contract sum by this amount 516,798.a6 <br /> The new contract net change sum fD.Do <br /> The new contract amendment sum (37,904.54 <br /> The new contract sum including this change order will be . ;553,092.64 <br /> Percents a of on final contract ~ ~ 7.36 <br /> N AN E OUE TQ AM N .36 <br /> App I ~ .~t:.~e~:c'T <br /> i ngineer Prime Co tractor Third Party <br /> Zrf~O'Z U <br /> Date Dat Date <br /> ? CONTRACTOR ? OFFICE FILE ? PURCHASINQ/CRO <br /> I <br /> I <br /> O\FORMS\PROJECTCONSTIREVISED CHANGE ORDER.XLS I <br /> <br />