Final Acceptance Publicworks <br /> Completion of Warranty Period Engineering <br /> 244 East Broadway <br /> Eugene, OR 97401 <br /> (541) 682-5560 <br /> (541)682-8410 <br /> To: Eugene Sand and Gravel Date: November 27, 2007 <br /> PO BOX 1067 <br /> EUGENE, OREGON 97440 From: Thomas Fahsbender <br /> Project: PPP Polk Street <br /> Contract Number. 2t-023 Job Number~,.~ <br /> A warranty inspection has been made on this project in accordance with Section 00150 of the <br /> City Standard Specfications and Standard Drawings. <br /> No defects were noted and/or were corrected the project is hereby accepted by the City for <br /> permanent maintenance. <br /> FOR PRIVATELY ENGINEERED PROJECTS ONLY <br /> Engineer. <br /> Address: <br /> Ovmer. <br /> Address: <br /> <br /> Q: ROJECTS\PROJ-2\4352\Correspondence\Contractors\4352-2007-11-27-Final Acceptance.doc <br /> ENG 1122 Contractor Fife Engineer Owner Surety PW Admin Construction Manager GJ~ Revised 4/04 <br /> Finance/Accts Receivable for assessable projects or City Recorders Office for nonassessable projects M~ <br /> <br />