Final Acceptance Pubiic Works <br /> completion of Warranty Period Engineering <br /> 244 East Broadway <br /> Eugene, OR 97401 <br /> (541)682-5560 <br /> (541)682-8410 <br /> To:. Eugene Sand & Gravel Date: October 9, 2007 , / <br /> PO Box 1067 V <br /> Eugene OR 97401 From: Patrick Cox, P.E. <br /> Project: 2006 REHAB SOUTH RAMP TAXILANES <br /> Contract Number: ''"`.2006-27 Job Number: ~ ,9, <br /> A warranty inspection has been made on this project in accordance with Section 00150 of the <br /> City Standard Specifications and Standard Drawings. <br /> No defects were noted and/or were corrected the project is hereby accepted by the City for <br /> permanent maintenance. <br /> FOR PRIVATELY ENGINEERED PROJECTS ONLY <br /> Engineer. <br /> Address: <br /> Owner. <br /> Address: <br /> <br /> Q:\PR JECTS\PROJ-9\4359\Correspondence\Contractors\4359-20071009 Final Acceptance Completion of Warranty Period.doc <br /> ENG 1122 Contractor File Engineer Owner Surety PW Admin Construction Manager Revised 4104 <br /> Finance/Accts Receivable for assessable projects or City Recorders Office for nonassessable projects <br /> <br />