<br /> Final Acceptance Public Works <br /> <br /> Completion of Warranty Period Engineering <br /> 244 East Broadway <br /> Eugene, OR 97401 <br /> (541)682-5560 <br /> (541)682-8410 <br /> To: H & J Construction Date: 10/18/06 <br /> Attn: Phil Heer <br /> P.O. Box 2432 From: Kris Olson <br /> Eugene, Oregon 97402 <br /> Project: East General Aviation Area Storm <br /> Contract Number. 2006-10 Job Number: 4356 <br /> A warranty inspection has been made on this project in accorciance with Section 00150 of the <br /> City Standard Specifications and Standard Drawings. <br /> No defects were noted and/or were connected the project is hereby accepted by the City for_ <br /> permanent maintenance. <br /> 10-19-Ob A05~49 IN <br /> FOR PRNATELY ENGINEERER PROJECTS ONLY <br /> Engineer. <br /> Address: <br /> Owner. <br /> Address: <br /> Q:\P OJECTS\PROJ-6\4356\Correspondence\Contractors 4356-20061018Completion of Warranty Period-rf.doc <br /> ENG 1122 Contractor File Engineer Owner Surety PW Admin Construction Manager Revised 4/04 <br /> Finance/Accts Receivable for assessable projects or City Recorders Office for nonassessable projects <br /> <br />