Final Acceptance Public Works <br /> Completion of Warranty Period Engineering <br /> 244 East Broadway <br /> Eugene, OR 97401 <br /> (541) 682-5560 <br /> (541)682-8410 <br /> To: Wildish Construction Co. Date: November 28, 2007 <br /> Attention: Colin Cunningham <br /> PQ Box 7428 From: Mike Koivula <br /> Eugene OR 97401-0428 <br /> Project: Pavement Preservation Program: Hilyard Street 13th to 24th <br /> Contract Number. 006-24 Job Numbe <br /> A warranty inspection has been made on this project in accordance with Section 00150 of the <br /> City Standard Specifications and Standard Drawings. <br /> ~r' No defects were noted and/or were corrected the project is hereby accepted by the Ciiy for <br /> permanent maintenance. <br /> FOR PRNATELY ENGINEERED PROJECTS ONLY <br /> Engineer. <br /> Address: <br /> Owner: <br /> Address: <br /> <br /> Q: OJECTS\PROJ-9\4369\Correspon ence\Contractors\4369-20071128-Fina Acceptance Comp etion of Warranty Perio .doc <br /> ENG 1122 Contractor File Engineer Owner Surety PW Admin Construction Manager ~`y(~ Revised 4/04 <br /> Finance/Accts Receivable for assessable projects or City Recorders Office for nonassessable projects ~W <br /> <br />