EUGENE WATER & ELECTRIC BOARD <br /> ELECTRIC UNDERGROUND EXTENSION AGREEMENT 3:i~ ~l.3.:~J ~ (;r`10U <br /> 75 i 3.~ <br /> Date of Application: August 22, 2007 ,.l <br /> City Of Eugene, hereinafter called the customer, requests the Eugene Water & Electric Board, hereinafter caife WF,~/to ext n its electric system to l <br /> serve: ~D~~ 4 ~ - <br /> Project Name & Location: Willakenzie Park UG Secondary Extension 6 ' Pte' ~ I '"1 <br /> 1735 Best Lane <br /> Customer agrees the electric distribution extension will be provided in accordance with the requirements and obligations of s re ent and <br /> the attached Exhibits. Utility service is also subject to EWEB's applicable policies, regulations and rates no>.v:in exi~stdn~e.or.hereafter adopted, and the <br /> attached drawing #B-24680. Customer has received and read copies of EWEB's existing written policies and standards. <br /> Customer will execute all easements required by EW EB at no cost to EWEB. When practical, the customer will include such easements in the <br /> recorded plat of the above-mentioned development. Customer will further record deed restrictions requiring underground service to all properties to be <br /> served by the underground distribution system being installed. Customer agrees that all easements shall provide that no buildings or structures may be <br /> constructed on such easements. <br /> Customer is aware of the right, as provided in ORS 92.097, to employ a licensed engineer to design or supervise the installation of the <br /> improvements provided for in this Agreement, but declines to do so. <br /> Unless otherwise specified in this Agreement, the customer agrees to payfor the following extension charges prior to EW EB's commencement of <br /> work: <br /> Contribution in aid of construction = s 9,367.00 <br /> Other = <br /> All charges above are subject to change if this Agreement is not signed and returned within thirty (30) days of fhe application date above and if <br /> the extension facilities are not installed with permanent service connections within six (6) months of the date of application. <br /> This Agreement authorizes EWER to proceed with the necessary steps to provide electrical underground services as shown on the attached <br /> drawing; however, it is understood that until the conditions of this Agreement are complied with, EWER will not install the extension facilities. <br /> Customer agrees to inform alt subsequent owners of the requirements and obligations of underground service in accordance with the Board's <br /> policies and procedures. This Agreement shall bind and benefit the heirs, personal representatives, successors or assigns of the respective parties. <br /> ® EWER-CONSTRUCTED SUBSTRUCTURES: <br /> Customer will be responsible for providing, within six inches (li") of final grade, compacted level ground of adequate width for <br /> EWER to install the utility systems. Customer will provide finished grade stakes and property corners so EWER can install the utility <br /> system at proper depth and location. Customer will monitor EWEB's installation to assure the installation is according to stakes that <br /> have been provided. <br /> ? CUSTOMER-INSTALLED SUBSTRUCTURES: <br /> Customer will own and maintain all customer-installed ducts and vaults, including service ducts in accordance with EWEB's <br /> service policies. EWEB will own and maintain all other underground system facilities. It is understood that the customer will <br /> construct and furnish service lateral, including duct, trench and backfill in accordance with EWER policy. <br /> Customer assumes all liability and agrees to indemnify EWEB for all damages to EWER facilities caused by the customer or <br /> customer's agents. <br /> After one year, EWEB shall assume ownership and responsibility for maintenance and repair of the service lateral conductors <br /> only. (See Board Policy, Electric Service Section IID(5).) . <br /> ? DEVELOPER-INSTALLED SUBSTRUCTURES: <br /> EWEB shall allow Developer to construct substructure facilities required to serve a development. <br /> Electric substructure installed in accord with Construction By Developer (CBD) policy must comptywith the CBD Handbook, <br /> approved drawings, standards and material specifications. All work will be Inspected, and installations that do not comply will not be <br /> energized. Once accepted, electric substructure installed by the CBD policy becomes the property of EWER. Developers are <br /> required to provide payment and performance bonds, and to warrant the work for one year after acceptance. <br /> All service conduit will be installed, ned d maintained by customer. <br /> Date Customer Si ned: ~ Z'q b <br /> 9 Lq(I G vZ ~~c°~ ~ <br /> City Of Eugene (Josh Richmand) Home/Business Phone <br /> Business name or Customer Name (Printed) <br /> cS~li ~a i 63 `t f <br /> CeAular Phone <br /> Authorized Signature <br /> 858 Pearl St. Company T1N# <br /> Eugene, OR 97401 <br /> Mailing Address Customer Social Security Number (optional) <br /> EUGENE WATER & ELECTRIC BOARD Job 29597 Job Chief: Marcus Lynch <br /> By: <br /> Electric Distribution Supervisor - <br /> <br /> Date: <br /> <br /> Date Connected <br /> Revised: 11/23/04 <br /> <br />