New Search
My WebLink
|
Help
|
About
|
Sign Out
New Search
GJN4428 Begin Warranty
COE
>
PW
>
Admin
>
Finance
>
Capital
>
2008
>
GJN4428 Begin Warranty
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
1/19/2010 4:51:07 PM
Creation date
6/5/2008 2:16:16 PM
Metadata
Fields
Template:
PW_Capital
PW_Document_Type_Capital
Warranty
PW_Active
No
External_View
No
GJN
004428
Identification_Number
Begin Warranty
COE_Contract_Number
2007-00021
Retention_Destruction_Date
12/20/2017
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
Page 1 of 1
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
Show annotations
View images
View plain text
Notification of Commencement and <br />Completion Dates for Contract Projects <br />Public Works <br />Engineering <br />City of Eugene <br />244 E. Broadway <br />Eugene, OR 97401 <br />(541)682-5560 <br />DATE CONTRACT NO. <br />4/30/2008 2007-21 <br />PROJECT NAME JOB NO. <br />Willagillespie Rd 2007 PPP 4428 <br />CONTRACTOR FEDERAL AID PROJECT N0. <br />Wildish Construction <br />INSPECTOR PHONE NUMBER DATE OF AWARD <br />Glen A. Fee 541-682-5195 6/13/2007 <br />FIRST NOTIFICATION <br />6/18/2007 IS THE DATE ON WHICH THE CONTRACT WORK BEGAN. Inspector Signature <br />SECOND NOTIFICATION <br />SPECIFIED COMPLETION DATE (S) (FROM SECT. 00180.50) DAYS CHARGED DATE (S) THE WORK WAS SUBSTANTIALLY <br />BEYOND SPECIFIED COMPLETED & THE TIME CHARGES STOPPED. <br />COMPLETION <br />7/30/07 7/17/07 <br />ALL CLAIMS FOR ADDITIONAL COMPENSATION MUST BE SUBMITTED BY: 8/2I2007 <br />(SEE SUBSECTION 00199.30 OF THE CONTRACT PROVISIONS FOR ADDITIONAL REQUIREMENTS.) <br />Inspector Signature <br />THIRD NOTIFICATION <br />Notice of Completion. Begin Warranty Period. <br />9/7/2007 IS THE DATE ON WHICH ALL CONTRACT WORK WAS COMPLETED, INCLUDING CORRECTIVE WORK, EQUIPMENT AND <br />PLANT REMOVAL, SITE CLEANUP, AND PROJECT MANAGER'S RECEIPT OF ALL CERTIFICATIONS, BILLS AND OTHER DOCUMENTS <br />REQUIRED UNDER THE CONTRACT. THIRD NOTIFICATION INITIATES THE START OF THE ONE YEAR WARRANTY PERIOD. <br />IN ACCORDANCE WITH SECTION 00170 OF THE STANDARD SPECIFICATIONS AND CITY AMENDMENT ~13, ALL WORK IS GUARANTEED BY THE <br />CONTRACTOR FOR ONE YEAR FOLLOWING THE DATE OF THE CITY'S NOTICE OF WORK COMPLETION. MANUFACTURE WARRANTIES <br />REMAIN IN EFFECT FOR THE DURATION OF THE EXPRESSED LENGTH OF THE WARRANTY IF GREATER THAN THE REQUIRED ONE YEAR. <br />THE CONTRACTOR IS RESPONSIBLE FOR REPAIRS OR REPIACEMENTS MADE NECESSARY BY DEFECTS IN WORK THAT BECOME EVIDENT <br />WITHIN THE ONE-YEAR WARRANTY PERIOD. REPAIRS OR REPLACEMENTS MADE WITHIN THE ONE-YEAR W NTY PERIOD ILL BE <br />REQUIRED TO BE GUARANTEED FOR ONE YEAR FROM DATE OF ACCEPTANCE OF THE REPAIR. <br />Inspect S' nature <br />For Privatel En ineered Pro'ects Onl <br />Y 9 1 Y , <br />Engineer: <br />Address ', <br />I <br />Owner: <br />Address: <br />DISTRIBUTION FOR FIRST, SECOND, AND THIRD NOTIFICATION: <br />Contractor E~ <br />ineer Owner C <br />n <br />t <br />ti <br />M <br />~~ Fil <br />D <br />PWM <br />J <br />g <br />ruc <br />on <br />o <br />s <br />anager <br />e <br />amon <br />oyner, <br />ADDITIONAL DISTRIBUTION FOR THIRD NOTIFICATION: <br />Maintenance-Planning Surety PW Administration PIC Engineering PWE As Construct Monitor MADD Supervisor inspector <br />Q:\PROJECTS\PROJ-8\4428\Correspondence\Contractors\4428 20070907 Third Notification.doc APRIL 2004 ~{b <br />
The URL can be used to link to this page
Your browser does not support the video tag.