Notification of Commencement and Pubii~wo~s <br />Completion Dates for Contract Projects Engineering <br />City of Eugene <br />244 E. Broadway <br />Eugene, OR 97401 <br />(541)682-5560 <br />DATE CONTRACT NO. <br />4/30/2008 2007-21 <br />PROJECT NAME JOB NO. <br />Gilham Rd 2007 PPP 4q,26 <br />CONTRACTOR FEDERA~ AID PROJECT N0. <br />Wildish Construc6on <br />INSPECTOR PHONE NUMBER DATE OF AWARD <br />Glen A. Fee 541-682-5195 6/13/2007 <br />FIRST NOTIFICATION <br />6/21/2007 IS THE DATE ON WHICH THE CONTRACT WORK BEGAN. Inspector Signature <br />SECOND NOTIFICATION <br />SPECIFIED COMPLETION DATE (S) (FROM SECT. 00180.50) DAYS CHARGED DATE (S) THE WORK WAS SUBSTANTIAL~Y <br />BEYOND SPECIFIED COMPLETED & THE TIME CHARGES STOPPED. <br />COMPIETION <br />7/20/07 7/17/07 <br />ALL CLAIMS FOR ADDITIONAL COMPENSATION MUST BE SUBMI7TED BY: 8/2/2007 <br />(SEE SUBSECTION 00199.30 OF THE CONTRACT PROVISIONS FOR ADDITIONAL REQUIREMENTS.) <br />Inspector Signature <br />THIRD NOTIFICATION <br />Notice of Completion. Begin Warranty Period. <br />9/7/2007 IS THE DATE ON WHICH ALL CONTRACT WORK WAS COMPLETED, INCLUDING CORRECTIVE WORK, EQUIPMENT AND <br />PLANT REMOVAL, SITE CLEANUP, AND PROJECT MANAGER'S RECEIPT OF ALL CERTIFICATIONS, BILLS AND OTHER DOCUMENTS <br />REQUIRED UNDER THE CONTRACT. THIRD NOTIFICATION INITIATES THE START OF THE ONE YEAR WARRANTY PERIOD. <br />IN ACCORDANCE WITH SECTION 00170 OF THE STANDARD SPECIFICATIONS AND CITY AMENDMENT #3, ALL WORK IS GUARANTEED BY THE <br />CONTRACTOR FOR ONE YEAR FOLLOWING THE DATE OF THE CITI''S NOTICE OF WORK COMPLETION. MANUFACTURE WARRANTIES <br />REMAIN IN EFFECT FOR THE DURATION OF THE EXPRESSED LENGTH OF THE WARRANTY IF GREATER THAN THE REQUIRED ONE YEAR. <br />THE CONTRACTOR IS RESPONSIBLE FOR REPAIRS OR REPLACEMENTS MADE NECESSARY BY DEFECTS IN WORK THAT BECOME EVIDENT <br />WITHIN THE ONE-YEAR WARRANTY PERIOD. REPAIRS OR REPLACEMENTS MADE WITHIN THE ONE-YEAR NTY ERIOD WILL BE <br />REQUIRED TO BE GUARANTEED FOR ONE YEAR FROM DATE OF ACCEPTANCE OF THE REPAIR. <br />~~ <br />C==~ <br />° "' <br />~ <br />e <br />inspect igna <br />tu <br />For Privately Engineered Projects Only <br />Engineer: <br />Address: <br />Owner: <br />Address: <br />DISTRIBUTION FOR FIRST, SECOND, AND THIRD NOTIFICATION: <br />Contractor Engineer Owner Construction Manager ~~ File Damon Joyner, PWM <br />ADDITIONAL DISTRIBUTION FOR THIRD NOTIFICATION: <br />Maintenance-Planning Surety PW Administration PIC Engineering PWE As Construct Monitor MADD Supervisor lnspector <br />Q:\PROJECTS\PROJ-614426\Correspondence\Contractors\4426 20070907 Third Notification.doc aPRI~ 2004 ~~ <br />_ __ _ __ _ _ <br />