New Search
My WebLink
|
Help
|
About
|
Sign Out
New Search
PAF4396
COE
>
PW
>
Admin
>
Finance
>
Capital
>
2008
>
PAF4396
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
1/19/2010 4:43:25 PM
Creation date
6/4/2008 2:30:45 PM
Metadata
Fields
Template:
PW_Capital
PW_Document_Type_Capital
Project Authorization
PW_Active
No
External_View
No
GJN
004396
GL_Project_Number
975132
Retention_Destruction_Date
5/1/2019
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
9
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
Show annotations
View images
View plain text
E <br /> Draft PROJECT BUDGET DEVELOPMENT SHEET <br /> Clty of Eugene Parks Planning <br /> PROJECT: Willakenzie Park <br /> CAP. PROJ. <br /> DATE: 1.30.08 <br /> PM: Hostick <br /> BUDGET ALLOCATION <br /> SERVICES BUDGET <br /> Outside Services <br /> Geotechnical 0.0% $ 0 <br /> Environmental 0.0% $ 0 <br /> AIE Pre-Design 0.0% $ 0 <br /> A/E Design 0.0% $ 0 <br /> A/E Design Contingency 0.0% $ 0 <br /> A/E Reimbursables 0.0% $ 0 <br /> Traffic Impact Analysis 0.0% $ 0 <br /> 1 °k for Arts 1 0% $ 0 <br /> subtotal 1.0% 0 <br /> In-House Services <br /> Survey 1.0% $ 8,000 <br /> Bid Advertising 01% $ 850 <br /> Inspection & Testing 0.8% $ 4,500 <br /> Planning, Design, and Engineering 10.9% $ 65,484 <br /> Permits 1.1% $ 8,800 <br /> SDC'S 9.2% $ 55,000 <br /> subtotal 21.2% 138,234 <br /> TOTAL SERVICES 23.0% $138,234 <br /> CONSTRUCTION BUDGET <br /> General Construction budget <br /> Contracted Construction 81.8% $ 369,413 <br /> Construction/Design Contingency 20.0°h $ 92,353 <br /> TOTAL CONSTRUCTION 81.8% 481,788 <br /> TOTAL BUDGET <br /> budget <br /> Services 23.0% $ 138,234 <br /> Construction 77.0% $ 481,768 <br /> TOTAL CONSTRUCTION 800,000 <br /> TOTAL REVENUE <br /> Revenue <br /> Pos Bard Meereure Alkrcation o.o% i o <br /> Park SDC's 100.0% $ 800,000 <br /> Donationst Fund RaiainA Z 0 <br /> Other 0.0% $ 0 <br /> TOTAL PROJECT BUDGET 100.0% 800,000 <br /> NOTE: percentages reflect percentage of total project budget <br /> <br /> Filbert Meadows Park Page 1 of 1 1/31/2006 <br /> <br />
The URL can be used to link to this page
Your browser does not support the video tag.