New Search
My WebLink
|
Help
|
About
|
Sign Out
New Search
GJN4890 closeout draft 2
COE
>
PW
>
Admin
>
Finance
>
Capital
>
2015
>
GJN4890 closeout draft 2
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
8/19/2014 8:47:02 AM
Creation date
8/19/2014 8:47:01 AM
Metadata
Fields
Template:
PW_Capital
PW_Document_Type_Capital
Project Close Out
PW_Active
Yes
External_View
No
GJN
004890
GL_Project_Number
935454
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
Page 1 of 1
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
Show annotations
View images
View plain text
<br />City of Eugene Public Works <br />Closeout Form <br />August 19, 2014 <br />GOOD JOB NUMBER004890 <br />PROJECT NUMBER935454 <br />PROJ / GJN DESCPBM: 13th and Interior Paving <br />BudgetExpendituresDifference <br />FUND / DESC <br />344 - 2012 Street Bonds 293,709.00389,028.28(95,319.28) <br />531 - Stormwater Utility - Capital 979.00760.00219.00 <br />532 - Wastewater Utility - Capital 490.00380.00110.00 <br />0.00 <br />$936.00(936.00) <br />EWEB <br />0.00 <br />Totals$295,178.00$391,104.28($95,926.28) <br />Notes: <br />Added $72 for PSF not posted <br />Fund 344 xfr from 905404 $96,255 <br />Fund 531 xfr to 975014 $219 <br />Fund 532 xfr to 975014 $110 <br />Need PO for EWEB billing <br />Warranty/As-built Fee$0.00BJE# Project post bid during <br />warranty vacation. <br />Tree's$0.00BJE# <br />Project ManagerDate <br />Principal Civil EngineerDate <br />1. Review funding and expenditures <br />2. Project Manager sign <br />3. Principal Civil Engineer sign <br />4. Forward to PWA <br />
The URL can be used to link to this page
Your browser does not support the video tag.