<br />x= 0 balance <br />j=inactive in Job Cost <br />n= Not set up in Job Cost <br />G=inactive in GL <br />Period 11 - 13 <br />ACK <br />ProjectProject NameSnapshot FY13 Budget AdjFY13 Actual AdjAdj RolloverFY14 BudgetFY14 ActualEncumbrancesFY14 Total <br />333 915542 000915542Amazon/Will River Path Conect 0.000.0048.50(49.00)0.000.000.00(49.00) <br />333 935432 000935432Safe Routes to School 2013 8,173.000.009,352.05(1,179.00)0.00120.000.00(1,299.00) <br />333 945020 000945020Capital As-Builts & Warranty 0.000.00678.89(679.00)0.000.000.00(679.00) <br />333 975404 000975404West Bank Trail Ext. 0.000.004.88(5.00)0.000.000.00(5.00) <br />