<br />PWE will be paying for 2 trees. If transportation planning wants the 3 other trees, just coordinate with Mike Bellmore. <br /> <br />Thanks. <br /> <br />Brian Davies, P.E. <br />City of Eugene <br />Public Works Engineering <br />99 East Broadway, Suite 400 <br />Eugene, OR 97401 <br />brian.s.davies@ci.eugene.or.us <br />541-682-5676 direct <br />541-505-4703 cell <br /> <br />From: INERFELD Rob <br />Sent: Thursday, August 16, 2012 11:01 AM <br />To: DAVIES Brian S <br />Subject: curb ramp at Sylvan <br /> <br />Hi Brian, <br /> <br />As of last night, the west-side curb ramp at Sylvan still did not have the concrete poured. <br /> <br />By the way, is everything set for installing 5 new trees in the bump-outs as part of this project? <br /> <br />Rob <br /> <br />--------------------------------------------------------------------- <br />Rob Inerfeld, AICP <br />Transportation Planning Manager <br />City of Eugene <br />Public Works Engineering <br />rob.inerfeld@ci.eugene.or.us <br />http://www.eugene-or.gov/transportation <br /> <br />ph: 541-682-5343 <br />fax: 541-682-5598 <br /> <br />3 <br />