<br /> <br /> <br /> <br /> <br />May 22, 2013 <br /> <br />CONTACT: Katie Marwitz, Project Manager, 541-501-0380 <br /> <br />From Public Information Section, 541-682-5523 or 541-954-2938 <br /> <br />FOR IMMEDIATE RELEASE <br /> <br /> <br /> <br />Lorane Highway Repair Project Starts Week of May 27 in South Eugene <br />Watch for periodic closures of Lorane Highway starting Tuesday, May 28, between <br />Paige Avenue and Washington Street in south Eugene. <br />Knife River Corporation, working under contract to the Eugene Public Works <br />Department, will fix the existing roadway using a recycling process called full-depth <br />reclamation. In this process the existing road structure is mixed in place with cement to <br />create a stable road base, and an asphalt pavement surface is applied as the top driving <br />surface. <br />The roadway will not be widened, and the project does not include improvements <br />such as sidewalks, curbs and gutters, street lights, or traffic calming. Care will be taken to <br />protect the trees along the road. <br />During construction, the road will be closed to through traffic in two phases: Paige <br />Street to Friendly Street; and Friendly Street to Washington Street. Local access will be <br />allowed with delays. The project is expected to be substantially completed by late June. <br />Funding for the $400,000 project is coming from the City of Eugene’s road fund. <br />For updates on this and other local road repair projects go to <br />www.keepusmoving.info. <br /># # # <br /> <br /> <br />Public Works Administration ● City of Eugene ● 101 E. Broadway, Suite 400, Eugene, OR 97401 <br />Phone 541-682-8421 ● Fax 541-682-6826 ● www.eugene-or.gov/pw <br />