New Search
My WebLink
|
Help
|
About
|
Sign Out
New Search
GJN 100045 PAF
COE
>
PW
>
Admin
>
Finance
>
Capital
>
2013
>
GJN 100045 PAF
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
4/16/2013 11:55:25 AM
Creation date
3/27/2013 3:20:41 PM
Metadata
Fields
Template:
PW_Capital
PW_Document_Type_Capital
Project Authorization
PW_Active
Yes
External_View
No
GJN
100045
GL_Project_Number
935462
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
3
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
Show annotations
View images
View plain text
i <br /> Skinner Butte Wayfinding and Connection Improvements Project <br /> Phase 2: Trailhead kiosks, maps, Interpretive signage, sidewalk and crosswalk <br /> Item Qty. Unit Cost Total Notes <br /> Construction mobilization 1 lump $5,000.00 $5,000.00 <br /> Erosion prevention 1 lump $1,250.00 $1,250.00 <br /> Tree preservation 1 lump $2,500.00 $2,500.00 <br /> Kiosk pads 2 ea $1,500.00 $3,000.00 <br /> Kiosks 2 ea $7,500.00 $15,000.00 <br /> Kiosk installation 2 ea $1,000.00 $2,000.00 <br /> Interpretive maps /exhibits 4 ea $1,500.00 $6,000.00 <br /> Interpretive sign pads 2 ea $400.00 $800.00 <br /> Interpretive sign frames 2 ea $500.00 $1,000.00 <br /> Interpretive sign install 2 ea $500.00 $1,000.00 <br /> Sidewalk construction 500 s.f. $13.00 $6,500.00 <br /> Crosswalk paint 1 lump $750.00 $750.00 <br /> Accessible Ramps 2 ea $2,000.00 $4,000.00 <br /> ROW Signage 1 lump $2,500.00 $2,500.00 <br /> Traffic Control 1 lump $500.00 $500.00 <br /> Clean up, backfill, seeding, etc. 1 lump $2,500.00 $2,500.00 <br /> Phase 2 Subtotal $54,300.00 <br /> 15% Construction Contingency $8,145.00 <br /> Phase 2 Total $62,445.00 <br /> Phase 2 Soft Costs <br /> Item Qty Unit Cost Total Notes <br /> Survey for ped walks 10 hrs $75.00 $750.00 <br /> Crosswalk + sidewalk design 20 hrs $86.00 $1,720.00 <br /> Sign install drawings 10 hrs $86.00 $860.00 <br /> Phase 2 RFQ Develop + solicit bids 15 hrs $86.00 $1,290.00 <br /> Phase 2 contract develop 4 hrs $86.00 $344.00 <br /> Project management 30 hrs $86.00 $2,580.00 <br /> Project inspection 30 hrs $75.00 $2,250.00 <br /> Erosion Permit 1 lump $1,250.00 $1,250.00 <br /> Building Permits 1 lump $2,500.00 $2,500.00 <br /> Traffic Control Permit 1 lump $500.00 $500.00 <br /> Soft Cost Subtotal $14,044.00 <br /> 15% soft Cost Contingency $2,106.60 <br /> Soft Cost Total $16,150.60 <br /> Total Phase 2 Costs $78,595.60 <br />
The URL can be used to link to this page
Your browser does not support the video tag.