SYSTEMS DEVELOPMENT CHARGE EXPENDITURE ALLOCATION WORKSHEET <br /> Project Name: POS Mangan and Bethel Park Lanscape Renovations <br /> Project Manager Name: Emily Proudfoot <br /> Service ID # (e.g. Good Job Number 664161): 96- 100046 Contract # (e.g. 2004 tbd Capital Protect # (e.g. 905244): tbd <br /> SDC Expenditure Requirements <br /> Improvement Fees: May be spent only on capital improvements included in an adopted Capital Improvement Plan that increase capacity needed to <br /> provide service for future users, including those that provide new facilities or increase the capacity provided by existing facilities. <br /> Wastewater Eligible: Non - assessable components of projects attributable to future development that drain those portions of pipes within the total area served by <br /> the project. [Quantify portions of project that are capacity enhancing; pro-rate design /construction management costs on a proportionate basis.] <br /> Stormwater Eligible: Non - assessable components of pipe or open channel projects attributable to future development that drain impervious surface areas within <br /> the total drainage basin served by the project. (Quantify portions of project that are capacity enhancing by determining the percent of project that will serve new <br /> development: The total existing impervious area of basin divided by the future build -out impervious area of basin equals the percent of project serving existing <br /> development. Subtract from 100% to derive the percentage of project that will serve new development.] <br /> Transportation Eligible: Non - assessable components attributable to future development of 1) arterial and collector street projects and related traffic signals, and <br /> 2) off - street bicycle path projects. (Quantify portions of project that are capacity enhancing; pro-rate design /construction management costs on a proportionate <br /> basis. In the case of major enhancement projects (e.g. Ferry Street Bridge), use analysis to establish the percent of projected trips on the facility that can be <br /> attributed to new development between year of construction and build out]. <br /> Parks Eligible: Components of Neighborhood or Community park projects attributable to future development. (Quantify portions of project that are capacity <br /> enhancing versus those portions needed to serve existing users. Pro -rate design /construction management costs on a proportionate basis.) <br /> Reimbursement Fees: May be spent only on capital improvements included in an adopted Capital Improvement Plan, including those for new <br /> facilities and rehabilitation of existing facilities. - <br /> Wastewater Eligible: Components noted above as well as rehabilitation of existing systems (may also serve existing development). <br /> Stormwater Eligible: Components noted above as well as rehabilitation of existing systems (may also serve existing development). <br /> Transportation Eligible: Per Council Resolution No. 4718, reimbursement fees will be budgeted for preservation and maintenance of the existing system <br /> (Council or the Budget Committee may subsequently allocate some or all for a different purpose as allowed by law). No transportation reimbursement SDC <br /> revenue is currently attributable to off - street bicycle paths; therefore no reimbursement fee expenditures are allowed for paths. <br /> Parks Eligible: Components noted above as well as rehabilitation of existing systems (may also serve existing development). <br /> Allocation Costs & Percentages of Total Project Costs <br /> Project Initiation Phase Bid Phase Final Phase <br /> Wastewater Improve. Fee $ % $ % $ <br /> Approved Amounts, if different: $ % $ % $ <br /> Wastewater Reimburse. Fee $ % $ <br /> Approved Amounts, if different: $ % $ % $ 4 % <br /> Stormwater Improve. Fee $ % $ % $ <br /> Approved Amounts, if different: $ % $ % $ <br /> Stormwater Reimburse. Fee $ % $ % $ jo r <br /> Approved Amounts, if different: $ % $ % $ <br /> Transportation Improve. Fee $ % $ % $ <br /> Approved Amounts, if different: $ % $ % $ <br /> Transportation Reimburse. Fee $ % $ % $ <br /> Approved Amounts, if different: $ % $ % $ <br /> Parks Improve. Fee $ % $ % $ <br /> Approved Amounts, if different: $ % $ % $ <br /> Parks Reimburse. Fee $ 31,500.00 50% $ % $ <br /> Approved Amounts, if different: $ % $ % $ <br /> Expenditure Allocation Justification <br /> Attach documentation that demonstrates justification of SDC funding of this capital project at project initiation phase as well as at time of any <br /> subsequent revisions of SDC allocation amountslpercentages. <br /> State law requires an annual accounting of SDC expenditures by system at the project level. An SDC expenditure may be legally challenged for up to <br /> two years after the expenditure. <br /> Approved By: Emily Proudfoot <br /> Date: 1/28/2013 Date: Date: <br /> • <br /> P. \Cdocs \Contracts \CapitalProjects \GJN 100046 Mangan - Bethel Parks Renovations \SDC_Funding_Worksheet,xls Revised March, 2004 <br />