New Search
My WebLink
|
Help
|
About
|
Sign Out
New Search
Work Starts Monday on Repairs to West Bank Path
COE
>
PW
>
Admin
>
Public Affairs
>
2012
>
Work Starts Monday on Repairs to West Bank Path
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
8/23/2012 9:48:50 AM
Creation date
8/23/2012 9:48:48 AM
Metadata
Fields
Template:
PW_Public_Affairs
PW_Document_Type_Public_Affairs
News Release
PW_Division
Engineering
PW_Subject_Public_Affairs
Road Repairs
External_View
No
PWA_Release_Date
8/23/2012
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
Page 1 of 1
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
Show annotations
View images
View plain text
<br /> <br /> <br /> <br /> <br />August 23, 2012 <br /> <br />CONTACT: <br />Doug Singer, Project Manager, 541-682-8460 <br /> <br />From Public Information Section, 541-682-5523 or 541-954-2938 <br /> <br />FOR IMMEDIATE RELEASE <br /> <br /> <br />Work Starts Monday on Repairs to West Bank Path <br />Work is scheduled to begin Monday, August 27, on a project to resurface a portion of the <br />West Bank Path between the Greenway Bridge near Valley River and Stephens Drive off River <br />Road. <br />The existing 3,200-foot-long asphalt path will be resurfaced with concrete, and several <br />sections of the concrete path at the south end of Maurie Jacobs Park will be replaced. Brown <br />Contracting of Eugene has been hired by the City of Eugene to do the work. <br />During construction, which is estimated to take about eight weeks to complete, the path <br />will be closed. Cyclists and other users of the shared-use path can detour around the project on <br />the East Bank Path on the other side of the Willamette River (cross at the Owosso Bridge and <br />the Greenway Bridge) or on the sidewalks and bike lanes along River Road between Fir Lane <br />and Stults Avenue. <br />The primary source of funding for the estimated $425,000 project is the 2008 <br />voter-approved bond measure to fix streets and bike paths. <br />On bike paths elsewhere around town, work is substantially complete on the section of <br />the Fern Ridge Path between Chambers and Arthur streets although occasional closures are <br />likely as the contractor installs railings and does other finish work. Reconstruction of the North <br />Bank Path between the DeFazio Bridge and Leisure Lane is scheduled to begin in early <br />September. <br />More information about this another City of Eugene road and bike path repair projects <br />can be found at www.keepusmoving.info. <br /># # # <br /> <br />Public Works Administration ● City of Eugene ● 101 E. Broadway, Suite 400, Eugene, OR 97401 <br />Phone 541-682-8421 ● Fax 541-682-6826 ● www.eugene-or.gov/pw <br />
The URL can be used to link to this page
Your browser does not support the video tag.