permanently repair the damaged section. A temporary pavement patch will remain in place until the permanent <br />:www.eugene-or.gov/traffic. <br />repair has been determined. For the latest information on road projects, go to <br /> <br /> <br />/ <br />Kathy EvaPublic Information Specialist <br /> <br />City of Eugene/Stormwater Program <br /> <br />101 E. Broadway, Ste 400 <br /> <br />Eugene, OR 97401 <br /> <br />541-682-2739 <br /> <br />kathy.a.eva@ci.eugene.or.us <br /> <br /> <br />2 <br />