<br />SMITH Tammy D <br />From:RODRIGUES Matt J <br />Sent:Friday, June 01, 2012 2:07 PM <br />To:SMITH Tammy D <br />Subject:4614 High Street-Transportation SDCs xfer <br />Importance:High <br />Follow Up Flag:Follow up <br />Flag Status:Flagged <br />Tammy please move $35,000 from Fund 333 Account 974025 to GJN 4614. This represents the additional TransSDCs <br />needed in addition to the remaining state funding to reinstall the north two span wire poles and replace the span wire, <br />signal heads and pedestrian heads on High Street and Broadway. <br /> <br />Thank you, <br />Matt Rodrigues <br />Principal Engineer <br />Public Works Engineering <br />City of Eugene <br />Ph 541-682-6036 <br />Fx 541-682-8410 <br /> <br /> <br />1 <br />