Notification of Commencement and <br />Completion Dates for Contract Projects <br />Public Works <br />Engineering <br />City of Eugene <br />99 E. Broadway, #400 <br />Eugene, OR 97401 <br />(541) 682 -5291 <br />DATE <br />CONTRACT NO. <br />8/26/2011 <br />2011 -013 <br />PROJECT NAME <br />JOB NO. <br />Safe Routes To School <br />4715 <br />CONTRACTOR <br />FEDERAL AID PROJECT NO. <br />2G Construction <br />X -SRTS -2385 (075) <br />INSPECTOR <br />PHONE NUMBER <br />DATE OF AWARD <br />Charley Perini <br />541 -682 -5230 <br />5106/2011 <br />FIRST NOTIFICATION <br />5/18/2011 IS THE DATE ON WHICH THE CONTRACT WORK BEGAN. Inspector Signature <br />SECOND NOTIFICATION <br />SPECIFIED COMPLETION DATE (S) (FROM SECT. 00180.50) DAYS CHARGED DATE (S) THE WORK WAS SUBSTANTIALLY <br />BEYOND SPECIFIED COMPLETED & THE TIME CHARGES STOPPED. <br />COMPLETION <br />1/27/2012 0 1/26/2011 <br />ALL CLAIMS FOR ADDITIONAL COMPENSATION MUST BE SUBMITTED BY: 2 -11 -2012 <br />(SEE SUBSECTION 00199.30 OF THE CONTRACT PROVISIONS FOR ADDITIONAL REQUIREMENTS.) <br />Inspector Signature <br />THIRD NOTIFICATION <br />Notice of Completion. Begin Warranty Period. <br />3/27/2012 IS THE DATE ON WHICH ALL CONTRACT WORK WAS COMPLETED, INCLUDING CORRECTIVE WORK, EQUIPMENT AND <br />PLANT REMOVAL, SITE CLEANUP, AND PROJECT MANAGER'S RECEIPT OF ALL CERTIFICATIONS, BILLS AND OTHER DOCUMENTS <br />REQUIRED UNDER THE CONTRACT. THIRD NOTIFICATION INITIATES THE START OF THE ONE YEAR WARRANTY PERIOD. <br />IN ACCORDANCE WITH SECTION 00170 OF THE STANDARD SPECIFICATIONS AND CITY AMENDMENTS, ALL WORK IS GUARANTEED BY THE <br />CONTRACTOR FOR ONE YEAR FOLLOWING THE DATE OF THE'CITY'S NOTICE OF WORK COMPLETION. MANUFACTURE WARRANTIES <br />REMAIN IN EFFECT FOR THE DURATION OF THE EXPRESSED LENGTH OF THE WARRANTY IF GREATER THAN THE REQUIRED ONE YEAR. <br />THE CONTRACTOR IS RESPONSIBLE FOR REPAIRS OR REPLACEMENTS MADE NECESSARY BY DEFECTS IN WORK THAABECOME EVIDENT <br />WITHIN THE ONE -YEAR WARRANTY PERIOD. REPAIRS OR REPLACEMENTS MADE WITHIN THE ONE -YEAR R NTY RIOD WILL BE <br />REQUIRED TO BE GUARANTEED FOR ONE YEAR FROM DATE OF ACCEPTANCE OF THE REPAIR. <br />ffpe6tor Signature <br />For Privately Engineered Projects Only <br />Engineer: n/a <br />Address: <br />Owner: n/a <br />Address: <br />DISTRIBUTION FOR FIRST, SECOND, AND THIRD NOTIFICATION: <br />Contractor Engineer Owner Construction Manager File Ginger Perales, PWM Kris Olson, PWM <br />ADDITIONAL DISTRIBUTION FOR THIRD NOTIFICATION: <br />Rachel Burr, POS Surety PW Administratipn PIC Engineering PWE As Construct Monitor MADD Supervisor Inspector <br />r <br />Q: \PROJECTS \PROJ -5 \4715 Sate Routes to Schools 2010\CORRESPONDENCE1Contractors \4715 20120411 -jaj Third Notification.docMarch 2009 <br />