Notification of Commencement and <br />Completion Dates for Contract Projects <br />Public Works <br />Engineering <br />City of Eugene <br />99 E. Broadway, #400 <br />Eugene, OR 97401 <br />(541) 682 -5291 <br />DATE <br />CONTRACT NO. <br />3/27/2012 <br />2012 -08 <br />PROJECT NAME <br />JOB NO. <br />2011 Pothole Repair Project at Various Locations <br />4750 <br />CONTRACTOR <br />FEDERAL AID PROJECT NO. . <br />Wildish Construction Co. <br />N/A <br />INSPECTOR <br />PHONE NUMBER <br />DATE OF AWARD <br />J. Huffman <br />541- 359 -5697 <br />8/15/11 <br />FIRST NOTIFICATION <br />9/12111 IS THE DATE ON WHICH THE CONTRACT WORK BEGAN. Inspector Signature <br />SECOND NOTIFICATION <br />SPECIFIED COMPLETION DATE (S) (FROM SECT. 00180.50) DAYS CHARGED DATE (S) THE WORK WAS SUBSTANTIALLY <br />BEYOND SPECIFIED COMPLETED & THE TIME CHARGES STOPPED. <br />COMPLETION <br />15 Work days (9/30/11) 0 9/30/11 <br />ALL CLAIMS FOR ADDITIONAL COMPENSATION MUST BE SUBMITTED BY: 10/21/11 <br />(SEE SUBSECTION 00199.30 OF THE CONTRACT PROVISIONS FOR ADDITIONAL REQUIREMENTS.) <br />Inspector Signature <br />THIRD NOTIFICATION <br />Notice of Completion. Begin Warranty Period. <br />3/1612012 IS THE DATE ON WHICH ALL CONTRACT WORK WAS COMPLETED, INCLUDING CORRECTIVE WORK, EQUIPMENT AND <br />PLANT REMOVAL, SITE CLEANUP, AND PROJECT MANAGER'S RECEIPT OF ALL CERTIFICATIONS, BILLS AND OTHER DOCUMENTS <br />REQUIRED UNDER THE CONTRACT. THIRD NOTIFICATION INITIATES THE START OF THE ONE YEAR WARRANTY PERIOD. <br />IN ACCORDANCE WITH SECTION 00170 OF THE STANDARD SPECIFICATIONS AND CITY AMENDMENTS, ALL WORK IS GUARANTEED BY THE <br />CONTRACTOR FOR ONE YEAR FOLLOWING THE DATE OF THE CITY'S NOTICE OF WORK COMPLETION. MANUFACTURE WARRANTIES <br />REMAIN IN EFFECT FOR THE DURATION OF THE EXPRESSED LENGTH OF THE WARRANTY IF GREATER THAN THE REQUIRED ONE YEAR. <br />THE CONTRACTOR IS RESPONSIBLE FOR REPAIRS OR REPLACEMENTS MADE NECESSARY BY DEFECTS IN WORK THAT BECOME EVIDENT <br />WITHIN THE ONE -YEAR WARRANTY PERIOD. REPAIRS OR REPLACEMENTS MADE WITHIN THE ONE -YEAR WAR PERIOD WI <br />REQUIRED TO BE GUARANTEED FOR ONE YEAR FROM DATE OF ACCEPTANCE OF THE REPAIR. <br />ns i ature <br />For Privately Engineered Projects Only <br />Engineer: <br />Address: <br />Owner: <br />Address: <br />DISTRIBUTION FOR FIRST, SECOND, AND THIRD NOTIFICATION: <br />Contractor Engineer Owner Construction Manager File Ginger Perales, PWM Kris Olson, PWM <br />ADDITIONAL DISTRIBUTION FOR THIRD NOTIFICATION: <br />Rachel Burr, POS Surety PW Administration PIC Engineering PWE As Construct Monitor MADD Supervisor Inspector <br />Q: \PROJECTS \PROJ -0 \4750 2011 Pothole Repairs \Correspondence \Contractors \4750 - Thierd Notification.doc March 2009( <br />