New Search
My WebLink
|
Help
|
About
|
Sign Out
New Search
GJN4487 Begin Warranty (2)
COE
>
PW
>
Admin
>
Finance
>
Capital
>
2012
>
GJN4487 Begin Warranty (2)
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
5/31/2012 4:08:50 PM
Creation date
4/11/2012 2:57:19 PM
Metadata
Fields
Template:
PW_Capital
PW_Document_Type_Capital
Warranty
PW_Active
No
External_View
No
GJN
004487
GL_Project_Number
374487
COE_Contract_Number
2011-00514
Retention_Destruction_Date
5/23/2022
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
Page 1 of 1
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
Show annotations
View images
View plain text
Notification of Commencement and Public works <br />Completion Dates for Contract Projects Engineering <br />City of Eugene <br />99 E. Broadway, #400 <br />Eugene, OR 97401 <br />(541) 682 -5291 <br />DATE <br />CONTRACT NO. <br />3126/2011 <br />2011 -514 <br />PROJECT NAME <br />JOB NO. <br />Timberline Hills Phase 2 <br />4487 <br />CONTRACTOR <br />FEDERAL AID PROJECT NO. <br />Eugene Sand Construction <br />n/a <br />INSPECTOR <br />PHONE NUMBER <br />DATE OF AWARD <br />Jason Johannesen <br />541 - 682 -2657 <br />n/a <br />FIRST NOTIFICATION <br />6/27/2011 1S THE DATE ON WHICH THE CONTRACT WORK BEGAN. Inspector Signature <br />SECOND NOTIFICATION <br />SPECIFIED COMPLETION DATE (S) (FROM SECT. 00180.50) DAYS CHARGED DATE (S) THE WORK WAS SUBSTANTIALLY <br />BEYOND SPECIFIED COMPLETED & THE TIME CHARGES STOPPED. <br />COMPLETION <br />n/a n/a 12/16/2011 <br />ALL CLAIMS FOR ADDITIONAL COMPENSATION MUST BE SUBMITTED BY: <br />(SEE SUBSECTION 00199.30 OF THE CONTRACT PROVISIONS FOR ADDITIONAL REQUIREMENTS.) <br />Inspector Signature <br />THIRD NOTIFICATION <br />Notice of Completion. Begin Warranty Period. <br />3/26/2012 IS THE DATE ON WHICH ALL CONTRACT WORK WAS COMPLETED, EXCEPT WORK INVOLVING CONSTRUCTION OF THE <br />STORMWATER SWALE, INCLUDING CORRECTIVE WORK, EQUIPMENT AND PLANT REMOVAL, SITE CLEANUP, AND PROJECT MANAGER'S <br />RECEIPT OF ALL CERTIFICATIONS, BILLS AND OTHER DOCUMENTS REQUIRED UNDER THE CONTRACT. THIS THIRD NOTIFICATION <br />INITIATES THE START OF THE ONE YEAR WARRANTY PERIOD FOR ALL WORK EXCEPT THE STORMWATER SWALE. UPON COMPLETION OF <br />THE STORMWATER SWALE, AN ADDITIONAL THIRD NOTIFICATION WILL BE ISSUED. <br />IN ACCORDANCE WITH SECTION 00170 OF THE STANDARD SPECIFICATIONS AND CITY AMENDMENTS, ALL WORK IS GUARANTEED BY THE <br />CONTRACTOR FOR ONE YEAR FOLLOWING THE DATE OF THE CITY'S NOTICE OF WORK COMPLETION. MANUFACTURE WARRANTIES <br />REMAIN IN EFFECT FOR THE DURATION OF THE EXPRESSED LENGTH OF THE WARRANTY IF GREATER THAN THE REQUIRED ONE YEAR. <br />THE CONTRACTOR IS RESPONSIBLE FOR REPAIRS OR REPLACEMENTS MADE NECESSARY BY DEFECTS IN WORK THAT BECOME EVIDENT <br />WITHIN THE ONE -YEAR WARRANTY PERIOD. REPAIRS OR REPLACEMENTS MADE WITHIN THE ONE -YEAR WARRANTY PERIOD WILL BE <br />REQUIRED TO BE GUARANTEED FOR ONE YEAR FROM DATE OF ACCEPTANCE OF THE REPAIR. <br />Ins e or Si nature <br />For Privately Engineered Projects Only <br />Engineer: Compass Engineering <br />Address: 4105 SE International Way, Suite 105 <br />Milwaukie, OR 97222 <br />Owner: GDL Construction, Inc <br />Address: 5933 NE Win.Sivers Dr, Ste 238 <br />Portland, OR 97220 -9093 <br />DISTRIBUTION FOR FIRST, SECOND, AND THIRD NOTIFICATION: <br />Contractor Engineer Owner Construction Manage File Ginger Perales, PWM Kris Olson, PWM <br />ADDITIONAL DISTRIBUTION FOR THIRD NOTIFICATION: <br />Rachel Burr, POS Surety PW Administration PIC Engineering PWE As Construct Monitor MADD Supervisor Inspector <br />Q: \PROJECTS \PROJ - 7\4487 Timberline Hills Ph2 \Correspondence \Contractors \4487- 20120326.third notice.jaj.pdf.doc March 2009 <br />
The URL can be used to link to this page
Your browser does not support the video tag.