...under all circumstances, perform required electrical connections /disconnections <br />associated with the Board's facilities. With the exception of washing and relamping, <br />agencies may not construct or make modifications to equipment located on the <br />Board's facilities. Such required work by the Board will be done upon receipt of <br />written request from the agency and the agency shall be billed for the actual cost <br />of such work. <br />For New Lights. EWEB will <br />...upon receipt of written request from agencies, design, order materials, and install <br />requested lighting or lighting systems from a selection of high-pressure sodium or <br />metal halide (energy efficient) fixtures; <br />...for systems installed by EWEB, recover full costs of installation from agency at <br />times of installation (including material, labor, equipment, and appropriate over- <br />head costs) ; <br />...if installed by EWEB, maintain records and provide to the agency revised maps of <br />the agency lighting system; <br />...provide a separate, monthly billing for energy costs, which shall include, but may <br />not be limited to, a four percent factor for overhead and a six percent factor for <br />in- lieu-of tax payment to the City of Eugene; <br />...provide, under contract with interested agencies, globe washing and relamping services <br />on an actual -cost basis; <br />...under contract, and upon receipt of written request from the agency, perform general <br />maintenance and repair of the agency-owned street lighting system, including, but not <br />limited to, removals, replacements, repairs and relocations. Charges by EWEB for <br />such maintenance and repair shall be based on actual cost; <br />..under all circumstances, perform required electrical connections /disconnections associ- <br />ated with the Board's facilities. With the exception of washing and relamping, agencies <br />may not construct or make modifications to equipment located on the Board's facilities <br />Such required work by the Board will be done upon receipt of written request from <br />the agency and the agency shall be billed for the actual cost of such work. <br />Agency Benefits <br />Immediate and Substantial Reduction in annual direct EWEB Charges: <br />Agency Scheduling and Control of Operations <br />...Agency can contract with EWEB from year to year for globe washing / relamping based <br />on agency needs and funds available, or <br />...Agency can perform their own globe washing /relamping if equipment available, or <br />...Agency can contract with other local firms to provide washing /relamping services. <br />Agency Scheduling and Control of New Installations <br />...Agency can budget for new installations on an annual cas basis; <br />...with the exception of involvement with the Board's facilities, agency may perform <br />or contract with other firms for the construction of new or modification of existing <br />street lighting systems; <br />...no waiting for EWEB to have funds available. <br />Annual Savings from reduced payment to EWEB may pay for maintenance or offset the <br />cost of new installations. <br />Agency Can Take Advantage of Benefits of advancing cost-reducing industry technology <br />instead of paying at fixed capital amortization rates. <br />EWEB Benefits <br />1982 Budget Cost Savings <br />$500,000 (Capital for new lighting installations) <br />228,000 (Operation /maintenance - -allocated to street lighting) <br />$728,000 Total 1982 Cost Savings <br />(337,980) Reduced Revenue (Reduced Street Light Rates) <br />$390,020 Net 1982 Savings to EWEB <br />Would <br />Annual <br />Now Pays <br />Pay <br />Savings <br />City of Eugene <br />$353,603 <br />$101,043 <br />$252,560 <br />Rainbow WD <br />3,315 <br />823 <br />2,592 <br />Glenwood WD <br />3,486 <br />1,711 <br />1,775 <br />U of O <br />2,987 <br />1,347 <br />1,640 <br />City of Spfd. <br />82 <br />32 <br />50 <br />River Road WD <br />19,899 <br />5,922 <br />13,977 <br />Lane County <br />25,415 <br />6,403 <br />19,012 <br />Santa Clara WD <br />33,244 <br />12,519 <br />20,725 <br />Ore. St. Hwy. <br />34,439 <br />8,941 <br />25,498 <br />Sch. Dist. 52 <br />409 <br />158 <br />251 <br />Total <br />$476,879 <br />$138,899 <br />$337,980 <br />Agency Scheduling and Control of Operations <br />...Agency can contract with EWEB from year to year for globe washing / relamping based <br />on agency needs and funds available, or <br />...Agency can perform their own globe washing /relamping if equipment available, or <br />...Agency can contract with other local firms to provide washing /relamping services. <br />Agency Scheduling and Control of New Installations <br />...Agency can budget for new installations on an annual cas basis; <br />...with the exception of involvement with the Board's facilities, agency may perform <br />or contract with other firms for the construction of new or modification of existing <br />street lighting systems; <br />...no waiting for EWEB to have funds available. <br />Annual Savings from reduced payment to EWEB may pay for maintenance or offset the <br />cost of new installations. <br />Agency Can Take Advantage of Benefits of advancing cost-reducing industry technology <br />instead of paying at fixed capital amortization rates. <br />EWEB Benefits <br />1982 Budget Cost Savings <br />$500,000 (Capital for new lighting installations) <br />228,000 (Operation /maintenance - -allocated to street lighting) <br />$728,000 Total 1982 Cost Savings <br />(337,980) Reduced Revenue (Reduced Street Light Rates) <br />$390,020 Net 1982 Savings to EWEB <br />