Nations <br />Labor <br />Charges <br />1 <br />Equipment <br />Charges <br />3500psi Concrete /yd <br />$109.00 <br />1.50 <br />240.68 <br />16.35 <br />$179.85 <br />5000psi Concrete /yd <br />$127.00 <br />0.00 <br />$0.00 <br />Short Load Cost <br />$50.00 <br />1.00 <br />5.00 <br />$55.00 <br />CDF /yd <br />$77.00 <br />0.00 <br />$0.00 <br />Hot Water per Yd <br />$3.00 <br />1.50 <br />0.45 <br />$4.95 <br />0.00 <br />$0.00 <br />Rock - 3/4 -0 /ton <br />$6.75 <br />0.00 <br />$0.00 <br />Bark/yd <br />$12.75 <br />0.00 <br />$0.00 <br />Loam /ton <br />$8.00 <br />0.10 <br />0.08 <br />$0.88 <br />0.00 <br />$0.00 <br />0.00 <br />$0.00 <br />0.00 <br />$0.00 <br />0.00 <br />$0.00 <br />0.00 <br />$0.00 <br />0.00 <br />$0.00 <br />MATERIAL TOTAL: <br />1 $240.681 <br />PROJECT TOTAL: <br />Labor <br />Charges <br />1 <br />Equipment <br />Charges <br />0.00 <br />Material <br />Charges <br />240.68 <br />f OTAL: 1 1 1 <br />Sq /ft cost $11.34 <br />Approved John Bonham 341 - 9332 - 61739 - 354 - 905454 <br />Per Lacey 131- 9475 -45539 <br />