Final Acceptance <br />Completion of Warranty Period <br />Public Works <br />Engineering <br />99 East Broadway, Ste 400 <br />Eugene, OR 97401 <br />(541) 682 -5291 <br />(541) 682 -8410 <br />To: Eugene Sand and Gravel <br />PO Box 1067 <br />Eugene OR 97440 <br />Project: PPP Roosevelt Phase 2 <br />Contract Number: 2009 -08 <br />Date: February 10, 2012 <br />From: Dan Kepley <br />Job Number. 4479 <br />A warranty inspection has been made on this project in accordance with Section 00150 of the <br />City Standard Specifications and Standard Drawings. <br />No defects were noted and /or were corrected the project is hereby accepted by the City for <br />permanent maintenance. <br />FOR PRIVATELY ENGINEERED PROJECTS ONLY-- -� ---- <br />Engineer. <br />Address: <br />Owner. <br />Address: <br />Q:\PROJECTS\PROJ -9\ 4479 \Correspondence \Contractors \4479 Final Acceptance Completion of Warranty Period.doc <br />ENG 1122 Contractor File Engineer Owner Surety PW Admin; Construction Manager <br />Finance /Accts Receivable for assessable projects or City Recorders Office for nonassessable projects <br />Revised 4 <br />