Final Acceptance <br />Completion of Warranty Period <br />Public Works <br />Engineering <br />99 East Broadway, Ste 400 <br />Eugene, OR 97401 <br />(541) 682 -5291 <br />(541) 682 -8410 <br />To: Kipco, Inc <br />90465 Woodruff <br />Eugene, OR 97402 <br />Date: January 9, 2012 <br />From: Jason Johannesen <br />Project: Jacobs Drive Stormwater Relocation <br />Contract Number: 2010 -509 <br />Job Number: 4577 <br />A warranty inspection has been made on this project in accordance with Section 00150 of the <br />City Standard Specifications and Standard Drawings. <br />No defects were noted and /or were corrected the project is hereby accepted by the City for <br />permanent maintenance. <br />FOR PRIVATELY ENGINEERED PROJECTS ONLY <br />Engineer: Poage Engineering & Surveying, Inc. <br />Address: PO Box 2527 <br />Eugene, OR 97402 <br />Owner: James Paddock <br />Address: PO Box 2447 <br />Eugene, OR 97402 <br />Q:\PROJECTS\PROJ -7 \4577 - Jacobs Dr. SW \Correspondence \Contractors \4577- 20120109 jaj -Final Acceptance Completion of Warranty Period.doc <br />ENG 1122 Contractor File Engineer Owner Surety PW Admiri, Construction Manager Revised 4/04 <br />Finance /Accts Receivable for assessable projects or City Recorders Office for nonassessable projects <br />