New Search
My WebLink
|
Help
|
About
|
Sign Out
New Search
GJN4637 4435 Final Warranty
COE
>
PW
>
Admin
>
Finance
>
Capital
>
2012
>
GJN4637 4435 Final Warranty
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
4/17/2012 4:42:49 PM
Creation date
1/10/2012 9:31:21 AM
Metadata
Fields
Template:
PW_Capital
PW_Document_Type_Capital
Warranty
PW_Active
No
External_View
No
GJN
004637
004435
GL_Project_Number
995564
975534
COE_Contract_Number
2010-00022
Retention_Destruction_Date
2/14/2021
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
Page 1 of 1
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
Show annotations
View images
View plain text
Final Acceptance <br />Completion of Warranty Period <br />r0% <br />Viv Public Works <br />Engineering <br />99 East Broadway, Ste 400 <br />Eugene, OR 97401 <br />(541) 682 -5291 <br />(541) 682 -8410 <br />To: Knife River Corporation -NW <br />Attn: Jason Chamberlin <br />1001 Division Avenue <br />Eugene OR 97404 <br />Date: January 6, 2012 <br />From: Jason Johannesen <br />Project: PPP Valley River Drive and Goodpasture Island Road from Willagillespie Road to Delta <br />Ponds - Job# 4637; Goodpasture Island Road from Delta Hwy to Kingsley Road - Job #4435 <br />Contract Number: 2010 -022 <br />Job Number: 4637 & 4435 <br />A warranty inspection has been made on this project in accordance with Section 00150 of the <br />City Standard Specifications and Standard Drawings. <br />No defects were noted and /or were corrected the project is hereby accepted by the City for <br />permanent maintenance. <br />---------------------- -- ---- ---FOR PRIVATELY ENGINEERED PROJECTS ONLY <br />Engineer: n/a <br />Address: <br />Owner. n/a <br />Address: <br />Q:\PROJECTS\PROJ -7 \4637 PPP Valley River and Goodpasture Island Road \Correspondence \Contractors \4637 - 20120106 -jaj -Final Acceptance <br />Completion of Warranty Period.doc <br />ENG 1122 Contractor File Engineer Owner Surety PVV Admin,, Construction Manager Revised 4/04 <br />Finance /Accts Receivable for assessable projects or City Recorders Office for nonassessable projects r +� <br />
The URL can be used to link to this page
Your browser does not support the video tag.