Final Acceptance <br />Completion of Warranty Period <br />Public Works <br />Engineering <br />99 East Broadway, Ste 400 <br />Eugene, OR 97401 <br />(541) 682 -5291 <br />(541) 682 -8410 <br />To: Eugene Sand Construction Inc. Date: December 16, 2011 <br />PO Box 1067 <br />Eugene, OR 97440 From: Jason Johannesen <br />Project: PBM Willamette Street from 46th Ave to' 52nd Ave <br />Contract Number: 2010 -019 <br />Job Number: 4582, <br />A warranty inspection has been made on this project in accordance with Section 00150 of the <br />City Standard Specifications and Standard Drawings. <br />No defects were noted and /or were corrected the project is hereby accepted by the City for <br />permanent maintenance. <br />------------------------- --- --- FOR PRIVATELY ENGINEERED PROJECTS ONLY ---- -- ----- ---- -- <br />Engineer. n/a <br />Address: <br />Owner: n/a <br />Address: <br />renou.uoc <br />ENG 1122 Contractor File Engineer Owner Surety ,P dmin Construction Manager Revised 4/04 <br />Finance /Accts Receivable for assessable projects or City Recorders Office for nonassessable projects 0 <br />