10 MONTH WAR RANTY IleiSPEGTIOlei <br />The project listed below will satisfy its one year warranty obligation in the next 60 days. Please <br />provide a warranty inspection on the project. <br />It is the intent of this e-mail to coordinate the inspection efforts of the PWE and PWM staff on all <br />Capitol Improvement Plan (CIP) projects and Privately Engineered Public Improvement (PEPI) <br />projects prior to the expiration of the one year warranty period. In general, the role of the PWM <br />Staff will be to provide expertise, advice, and assistance to the PWE Staff by performing a final <br />inspection of the below listed project within the next four (4) weeks. It is the responsibility of the <br />PWM supervisors to e-mail deficiencies to the inspector initiating this e-mail. It is the <br />responsibility of the inspector to compile all deficiencies and review them with the Construction <br />Manager prior to contacting the prime contractor. If you do not respond to this e-mail within four <br />weeks we will assume you found no deficiencies. <br />At the time of this request it is the responsibility of the PWE inspector to provide to PWM a <br />usable cover sheet, in a size appropriate to the scope of the project, with the infrastructure <br />numbers and locations indicated when lines are to be tv'd. <br />The job number is no longer active and is listed as a reference number only. <br />Responsibility for administering the project and enforcing project requirements remains with the <br />PWE Staff and all communication with the contractor will go through the project inspector who <br />initiated this e-mail or through the PWE Construction Managers. <br />Please call if you have any questions. <br />JOB NAME: Scribbler Memorial Trust <br />CONTRACT NUMBER: 2011 -508 JOB NUMBER: 4484 <br />ONE YEAR WARRANTY WILL ExPIRE ON: 2/23/2012 <br />CONTRACTOR: Braun Excavating, Inc. <br />INSPECTOR & PHONE NUMBER: Jason Johannesen <br />PROJECT & DESCRIPTION: <br />❑ <br />Landscape <br />® Storm Drain <br />❑ <br />Wastewater ® Curb & Gutter <br />❑ <br />Sidewalk <br />® HMAC <br />® <br />Erosion Control ❑ Illumination <br />❑ <br />Traffic Signals <br />❑ Permanent Signs <br />❑ <br />Permanent Striping <br />❑ <br />Mechanical Storm <br />Water Facility <br />❑ <br />Vegetated Storm Water Facility <br />❑ <br />Other <br />C:A Users \CEWATDS \AppData \Local \Microsoft \Windows \Temporary Internet Files \Content.Outlook \GENMXE64 \4484 - 20111230 jaj -10 <br />MONTH WARRANTY INSPECTION.doc <br />