New Search
My WebLink
|
Help
|
About
|
Sign Out
New Search
GJN 004681 Inv 3784 LCPW
COE
>
PW
>
Admin
>
Finance
>
Capital
>
2012
>
GJN 004681 Inv 3784 LCPW
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
5/31/2012 4:06:40 PM
Creation date
12/12/2011 2:37:39 PM
Metadata
Fields
Template:
PW_Capital
PW_Document_Type_Capital
Invoices-Payments & Receivables
PW_Active
No
External_View
No
GJN
004681
GL_Project_Number
905424
Identification_Number
2012007598
COE_Contract_Number
2012-00002
Document_Number
3784
Retention_Destruction_Date
3/14/2022
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
9
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
Show annotations
View images
View plain text
-Page No. 2 <br />Run Date 10/31/2011 <br />Run Time 08.48`44 <br />Lane County <br />Billable Project Costs <br />Billable Project Costs for Fiscal Period 2011 -09 <br />Period begins 09/01/2011 and ends including 09/30/2011 <br />Project: <br />36644229 <br />PBM 18th Ave (4681) <br />Overhead Rates Applied <br />for this project: Federal (Where applicable) <br />Billed By <br />3636213 <br />Materials Testing <br />Proj• 36644229 <br />(\ <br />9/1/2011 <br />LABOR <br />Engineering Technician 2 <br />2 <br />$54.24 <br />$72.92 <br />AC DF'S <br />9/1/2011 <br />LABOR <br />Engineering Technician 2 <br />2 <br />$4972 <br />$6684 <br />CONCRETE SAMPLE PICKUP <br />� <br />c� <br />9/2/2011 <br />LABOR <br />Supervising Engineering Assoc <br />0.3 <br />$11 Ol <br />$1480 <br />. <br />TEST DATA REVIEW &LOGGING 01 V <br />9/9/2011 <br />EQUIPMENT <br />I TON PASSENGER VAN <br />1 <br />$1.71 <br />9/9/2011 <br />EQUIPMENT <br />2009 FORD ECONOLINE 12 Passenger van <br />1 <br />$1.51 <br />G n <br />9/9/2011 <br />LABOR <br />Engineering Technician 3 <br />1 <br />$28.14 <br />$37.83 <br />AC DF'S BASE LIFT (c!) <br />9/9/2011 <br />9/16/2011 <br />LABOR <br />EQUIPMENT <br />Sr Engineering Associate <br />1 TON PASSENGER VAN <br />1 <br />- 4 <br />$32.66 <br />$6.84 <br />$43.91 <br />AC TESTING <br />1 � <br />9/16/2011 <br />LABOR <br />Engineering Technician 3 <br />4 <br />$168.84 <br />$22699 <br />AC DF'S <br />9/16/2011 <br />EQUIPMENT <br />SUBUR 3/4T 4X4 - Phoenix <br />3 <br />$5.13 <br />9/16/2011 <br />LABOR <br />Engineering Technician 2 <br />3 <br />$74.58 <br />$100.27 <br />PCC TESTING < <br />P4085 Totals <br />$638.22 <br />$812.31 <br />$1,450.53 <br />P4086- <br />Asphalt sample pickup <br />TranDate <br />TranlD <br />Resource Employed <br />Qty <br />Amount <br />Overhead <br />Transaction Remark <br />9/9/2011 <br />9/9/2011 <br />EQUIPMENT <br />LABOR <br />1 TON PASSENGER VAN <br />Engineering Technician 3 <br />1.5 <br />1.5 <br />$2.57 <br />$42.21 <br />$56.75 <br />t l <br />P/U 2 AC SAMPLES <br />9/16/2011 <br />EQUIPMENT <br />SUBUR 3/4T 4X4 - Phoenix <br />1 <br />$171 <br />g <br />9/16/2011 <br />LABOR <br />Engineering Technician 2 <br />1 <br />$24.86 <br />$3342 <br />ASPHALT SAMPLE PICKUP S <br />P4085 Totals <br />$71.35 <br />$90.17 <br />$161.52 <br />P4090- <br />PCC quality control <br />TranDate <br />TranlD <br />Resource Employed <br />Qty <br />Amount <br />Overhead <br />Transaction Remark <br />8/22/2011 <br />EQUIPMENT <br />SUBUR 3/4T 4X4 - Phoenix <br />2 <br />$3.42 <br />8/22/2011 <br />LABOR <br />Engineering Technician 2 <br />2 <br />$49.72 <br />$66.84 <br />PCC TESTING <br />8/23/2011 <br />EQUIPMENT <br />SUBUR 3/4T 4X4 - Phoenix <br />2 <br />$3.42 <br />8/23/2011 <br />LABOR <br />Engineering Technician 2 <br />2 <br />$49.72 <br />$66.84 <br />PCC TESTING <br />8/24/2011 <br />EQUIPMENT <br />SUBUR 3/4T 4X4 - Phoenix <br />2 <br />$3.42 <br />8/24/2011 <br />LABOR <br />Engineering Technician 2 <br />2 <br />$74.58 <br />$100.27 <br />PCC TESTING <br />8/25/2011 <br />EQUIPMENT <br />1 TON PASSENGER VAN <br />2 <br />$342 <br />8/25/2011 <br />EQUIPMENT <br />SUBUR 3/4T 4X4 - Phoenix <br />2 <br />$342 <br />i� <br />t o <br />8/25/2011 <br />LABOR <br />Engineering Technician 2 <br />2 <br />$54.24 <br />$72.92 <br />CURB AND GUTTER SL /AIR/CYL <br />8/25/2011 <br />LABOR <br />Engineering Technician 2 <br />2 <br />$5594 <br />$75.21 <br />PCC TESTING �� C <br />8/26/2011 <br />EQUIPMENT <br />1 TON PASSENGER VAN <br />2 <br />$342 <br />8/26/2011 <br />EQUIPMENT <br />SUBUR 3/4T 4X4 - Phoenix <br />1 <br />$1 71 <br />
The URL can be used to link to this page
Your browser does not support the video tag.