Final Acceptance <br />Completion of Warranty Period <br />Public Works <br />Engineering <br />99 East Broadway, Ste 400 <br />Eugene, OR 97401 <br />(541) 682 -5291 <br />(541) 682 -8410 <br />To: Wildish Construction Co. <br />PO Box 7428 <br />Eugene, OR 97401 <br />Date: December 6, 2011 <br />From: Josh Pinkham <br />Project: 2010 POTHOLE REPAIR PROJECT <br />Contract Number: 2010 -0031 <br />Job Number: 4673 <br />A warranty inspection has been made on this project in accordance with Section 00150 of the <br />City Standard Specifications and Standard Drawings. <br />No defects were noted and /or were corrected the project is hereby accepted by the City for <br />permanent maintenance. <br />FOR PRIVATELY ENGINEERED PROJECTS ONLY <br />Engineer. <br />Address: <br />Owner: <br />Address: <br />Q:\PROJECTS\PROJ -3\ 4673 \Correspondence \Contractors \4673 Final Acceptance Completion, of Warranty Period.doc Mo <br />ENG 1122 Contractor File Engineer Owner Surety O V AN"n Construction Manager Rev' ed 4/04 <br />Finance /Accts Receivable for assessable projects or City Recorders Office for nonassessable projects - <br />