Report ID: LBILL001 <br />Lane County <br />BILLABLE PROJECT COSTS <br />Page No. 2 <br />Run Date 10/14/2011 <br />Run Time 08:54:29 <br />Billable Project Costs for Fiscal Period 2011 -08 Period begins 08/01/2011 and ends including 08/31/2011 <br />Project: 36644169 PBM Alder St (4682) Overhead Rates Applied for this project: Federal (Where applicable) <br />08/12/2011 EQUIPMENT SUBUR 3/4T 4X4 - Phoenix 1 $1.71 <br />✓08/12/2011 LABOR Engineering Technician 2 1 $24.86 $3342 ASPHALT SAMPLE PICKUP <br />P4086 Totals S 79.71 $ 100.26 $ 179.97 <br />P4090 -PCC quality control <br />TranDate <br />TranlD <br />Resource Employed <br />Qty <br />Amount Overhead <br />7/28/2011 <br />EQUIPMENT <br />SUBUR 3/4T 4X4 - Phoenix <br />1.5 <br />$2.57 <br />7/28/2011 <br />LABOR <br />Engineering Technician 2 <br />1.5 <br />$40.68 <br />$54.69 <br />,4 08/09/2011 <br />EQUIPMENT <br />SUBUR 3/4T 4X4 - Phoenix <br />1.5 <br />$2.57 <br />x'0810912011 <br />LABOR <br />Engineering Technician 2 <br />1.5 <br />$37.29 <br />$50.13 <br />✓08/1 l /2011 <br />EQUIPMENT <br />SUBUR 3/4T 4X4 - Phoenix <br />1.5 <br />$2.57 <br />A8 /11/2011 <br />LABOR <br />Engineering Technician 2 <br />1.5 <br />$37.29 <br />$50.13 <br />✓08/15/2011 <br />EQUIPMENT <br />SUBUR 3AT 4X4 - Phoenix <br />2 <br />$342 <br />✓0811512011 <br />LABOR <br />Engineering Technician 2 <br />2 <br />$4972 <br />$66.84 <br />✓8/16/2011 <br />EQUIPMENT <br />SUBUR 3/4T 4X4 - Phoenix <br />2 <br />$3.42 <br />✓08/16/2011 <br />LABOR <br />Engineering Technician 2 <br />2 <br />$4972 <br />$66.84 <br />48/17/2011 <br />EQUIPMENT <br />SUBUR 3/4T 4X4 - Phoenix <br />2 <br />$3.42 <br />V68/17/2011 <br />LABOR <br />Engineering Technician 2 <br />2 <br />$4972 <br />$66.84 <br />'08/18/2011 <br />EQUIPMENT <br />SUBUR 3/4T 4X4 - Phoenix <br />1.5 <br />$2.57 <br />'08/18/2011 <br />LABOR <br />Engineering Technician 2 <br />1.5 <br />$37.29 <br />$50.13 <br />P4090 Totals <br />$ 322.25 $ <br />405.60 <br />P4091- Concrete sample pickup <br />TranDate TranlD Resource Employed Qty Amount <br />t , ' 08/10/2011 EQUIPMENT 1 TON PASSENGER VAN 1 $1.71 <br />, ,08/10/2011 LABOR Engineering Technician 3 1 $28.14 <br />P4091 Totals S 29.85 <br />Transaction Remark <br />SL /AIR/CYL <br />CONCRETE TESTING <br />CONCRETE TESTING <br />PCC TESTING <br />PCC TESTING <br />PCC TESTING <br />PCC TESTING <br />$ 727.85 <br />Overhead Transaction Remark <br />$37.83 P/U CYLS <br />37.83 $ 67.68 <br />3636213 Materials Testine Total S 1822.21 <br />36644169 Project Grand Total 1 1913.99 <br />