Final Acceptance <br />Completion of Warranty Period <br />Public Works <br />Engineering <br />99 East Broadway, Ste 400 <br />Eugene, OR 97401 <br />(541) 682 -5291 <br />(541) 682 -8410 <br />To: Eugene Sand Construction <br />PO Box 1067 <br />Eugene, OR 97440 <br />Date: November 16, 2011 <br />From: Jason Johannesen <br />Project: Franklin Blvd: Agate - Walnut (Turn Lane and Median Revisions) <br />Contract Number. 2011 -504 <br />Job Number: 4665 <br />A warranty inspection has been made on this project in accordance with Section 00150 of the <br />City Standard Specifications and Standard Drawings. <br />No defects were noted and /or were corrected the project is hereby accepted by the City for <br />permanent maintenance. <br />-FOR PRIVATELY ENGINEERED PROJECTS ONLY <br />Engineer. Balzhiser & Hubbard Engineers <br />Address: 100 W 13" Ave <br />Eugene OR 97401 <br />Owner. U of O, Attn: Darin Dehle <br />Address: 1295 Franklin Blvd <br />Eugene OR 97403 <br />�:vr►cvr��i�,�rKUJ- DN4db.) rrankim.Agate Walnut. Medians Turnlanes.UOAreaMitigation \Correspondence \Contractors \4665- 20 1 1 1 1 1 6 jaj Final <br />Acceptance Completion of Warranty Period.doc <br />ENG 1122 Contractor File Engineer Owner Surety PwA,min Construction Manager Revised 4/04 <br />Finance /Accts Receivable for assessable projects or City Recorders Office for nonassessable projects. s <br />