<br /> SE corner Elysium Ave. & Cul-de-Sac 2250 – 2270 <br />16 Single E-W RD 759 <br />(Tree removal and stump grinding by others) <br /> <br /> <br />SE corner Elysium Ave. & Cul-de-Sac 2250 – 2270 <br />17 Single E-W RD 759 <br />(Shrub to be removed as part of this contract) <br /> <br /> <br />NW corner Elysium Ave. & Rocky St. <br />18 Single Ctr. E-19E <br />(Curbside to Setback sidewalks with bypass) <br /> <br /> <br />TOTAL BASE BID AMOUNT______________________ <br /> <br /> <br /> <br />Alternate “A” <br /> <br /> <br />19 Double E-19A <br />SW corner Forrester Way & Corydon St. <br /> <br /> <br /> <br />Alternate “B” <br /> <br /> <br /> <br />NW corner Sharon Way & Woodside Dr. Double <br />20 RD 756 <br />(Wings outside and Curb returns inside) <br /> <br /> <br /> <br />Alternate “C” <br /> <br /> <br /> <br />Monroe St. south end sidewalk along park <br />21 Single RD 755 <br />(Perpendicular ramp setback with wings) <br /> <br />Note: Bids will be based upon the contractor’s pre-bid visual inspection of the proposed sites for <br />retrofit and construction of the ramp work. The City will mark in white paint the limits of concrete <br />removal and proposed ramp to be constructed. The City will maintain the markings during the bid <br />process. It will be the contractor’s full responsibility to have a complete understanding of the type <br />of ramp to be constructed at each location. The standard drawing listed is for reference only as the <br />actual ramp may be modified in order to fit existing right-of-way, infrastructure and structures. City <br />staff can be available by appointment to assist with questions pertaining to the ramp construction <br />or type. City staff may be contacted at (541) 682-4883. <br /> <br />Time of Completion/Liquidated Damages: <br />The Contractor shall diligently prosecute the work to completion for all bid items by no later than <br />October 15, 2010 <br />. <br /> <br />It is agreed that the Contractor shall be liable for and shall pay to the City, as fixed, and agreed, <br />liquidated damages, and not as a penalty, the sum of two hundred dollars ($200.00) per day for <br />each calendar day of delay in completion of the work from the date for completion as specified <br />herein or in any written extension of time granted by the City. <br /> <br />NOTE: The following shall apply to all bid items: <br /> <br />TIME OF COMPLETION AS SPECIFIED WILL BE ENFORCED. LIQUIDATED DAMAGES WILL <br />BE DEDUCTED FROM PAYMENTS DUE. <br /> <br />12 <br />PI RFQ 2010200077 Sidewalk Access Ramps <br /> <br /> <br />