New Search
My WebLink
|
Help
|
About
|
Sign Out
New Search
2010-00410 Contract Sitework ADA Curb Retrofit
COE
>
PW
>
POS_PWM
>
Grants
>
2011 Audit Info
>
2010-00410 Contract Sitework ADA Curb Retrofit
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
11/9/2011 11:19:48 AM
Creation date
11/9/2011 11:08:11 AM
Metadata
Fields
Template:
COE_Contracts
COE_Contract_Number
2010-00410
COE_Contract_Document_Type
Contract
COE_Contract_Organization
SiteWork Construction
Department
Public Works
Contract_Administrator
Aanderud
Contract_Manager
Masoner, Wayne
External_View
No
Supplemental fields
GL_Project_Number
955224
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
81
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
Show annotations
View images
View plain text
16 <br />SE comer Elysium Ave. & Cul- de-Sac 2250 — 2270 <br />(Tree removal and stump grinding by others) <br />Single E -W <br />RD 759 <br />3,091.00 <br />17 <br />SE comer Elysium Ave. & Cul-de -Sac 2250 — 2270 <br />(Shrub to be removed as part of this contract) <br />Single E -W <br />RD 759 <br />2,591.00 <br />18 <br />NW comer Elysium Ave. & Rocky St (Curbside <br />to Setback sidewalks with bypass3 <br />Single ar. <br />E -19E <br />2,591.00 <br />Alternate "B" <br />TOTAL BASE BID AMOUNT: 5 4 <br />Note: Bids will be based upon contractor's pre-bid visual inspection of the proposed sites for <br />retrofit and construction of the ramp work. The City will mark in white paint the limits of <br />concrete removal and proposed ramp to be constructed. The City will maintain the markings <br />during the bid process. It will be the contractor's full responsibility to have a complete <br />understanding of the type of ramp to be constructed at each location. The standard drawing <br />listed is for reference only as the actual ramp may be modified in order to fit existing right -of- <br />way, infrastructure and structures. City staff can be available by appointment to assist with <br />questions pertaining to the ramp construction of type. City staff may be contacted at (541) 382- <br />4883. <br />Time of Completion /Liquidated Damages: <br />The Contractor shall diligently prosecute the work to completion for all bid items by no later than <br />October 15, 2010. <br />It is agreed that the Contractor be liable for and shall pay to the City, as foxed, and agreed, <br />liquidated damages, and not as a penalty, the sum of two hundred dollars ($200.00) per day for <br />each calendar day of delay In completion of the work from the date for completion as specified <br />herein or in any written extension of time granted by the.City. <br />NOTE: The following shall apply to all bid items: <br />TIME OF COMPLETION AS SPECIFIED WILL BE ENFORCED. LIQUIDATED DAMAGES WILL BE <br />DEDUCTED FROM PAYMENTS DUE. <br />12 <br />PI RFQ 2010200077 sidewalk Access Ramps. <br />Alternate "A" <br />19 <br />SW comer Forrester Way & Corydon St. <br />Double <br />E -19A <br />3,450.00 <br />Alternate "B" <br />20 <br />NW comer Sharon Way & Woodside Dr. (Wings <br />outside and Curb returns Inside <br />Double <br />RD 756 <br />3,550.00 <br />Alternate "C" <br />21 <br />Monroe St. south and Sidewalk along park <br />( Perpendicular ramp setback with wings <br />Single <br />RD 755 <br />2,495.00 <br />Note: Bids will be based upon contractor's pre-bid visual inspection of the proposed sites for <br />retrofit and construction of the ramp work. The City will mark in white paint the limits of <br />concrete removal and proposed ramp to be constructed. The City will maintain the markings <br />during the bid process. It will be the contractor's full responsibility to have a complete <br />understanding of the type of ramp to be constructed at each location. The standard drawing <br />listed is for reference only as the actual ramp may be modified in order to fit existing right -of- <br />way, infrastructure and structures. City staff can be available by appointment to assist with <br />questions pertaining to the ramp construction of type. City staff may be contacted at (541) 382- <br />4883. <br />Time of Completion /Liquidated Damages: <br />The Contractor shall diligently prosecute the work to completion for all bid items by no later than <br />October 15, 2010. <br />It is agreed that the Contractor be liable for and shall pay to the City, as foxed, and agreed, <br />liquidated damages, and not as a penalty, the sum of two hundred dollars ($200.00) per day for <br />each calendar day of delay In completion of the work from the date for completion as specified <br />herein or in any written extension of time granted by the.City. <br />NOTE: The following shall apply to all bid items: <br />TIME OF COMPLETION AS SPECIFIED WILL BE ENFORCED. LIQUIDATED DAMAGES WILL BE <br />DEDUCTED FROM PAYMENTS DUE. <br />12 <br />PI RFQ 2010200077 sidewalk Access Ramps. <br />
The URL can be used to link to this page
Your browser does not support the video tag.