City of Eugene Utility Right of Way Use Permits 4n <br />Billing Detail for the Month of September 2011 1W <br />Utility: Northwest Natural Gas <br />Engineering Dept Attn Denise Paz <br />220 NW 2nd <br />Portland, OR 97209 <br />Utility Type: Gas <br />Log # <br />Fee Type Billing Date Credit Month <br />Job Address <br />Activity Count <br />Fee <br />Admin Fee <br />Fee Total <br />Annual Cut Permit Activity 9/30/2011 <br />34 <br />$100.00 <br />$0.00 <br />$3,400.00 <br />2011 -267 <br />Right of Way Cut Permit 9/20/2011 <br />1 <br />$435.00 <br />$0.00 <br />$435.00 <br />975 High St, Eugene OR (800004335 -08) <br />2011 -277 <br />Right of Way Cut Permit 9/21/2011 <br />1 <br />$410.00 <br />$0.00 <br />$410.00 <br />2995 Hilyard St (3350366) <br />2011 -281 <br />Right of Way Cut Permit 9/26/2011 <br />1 <br />$410.00 <br />$0.00 <br />$410.00 <br />S Hilyard St & 28th Ave East (3350448) <br />Total fees for this billing: <br />$4,655.00 <br />October 28, 2011 <br />Page 4 of 7 <br />