New Search
My WebLink
|
Help
|
About
|
Sign Out
New Search
Delta Ponds OWEB Grant
COE
>
PW
>
POS_PWM
>
Contracts
>
Delta Ponds OWEB Grant
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
9/30/2011 2:15:17 PM
Creation date
8/18/2011 5:21:33 PM
Metadata
Fields
Template:
PW_Capital
PW_Document_Type_Capital
Contracts
PW_Active
Yes
External_View
No
GJN
100011
GL_Project_Number
995422
Identification_Number
2009-05411
COE_Contract_Number
2009-05411
GL_Grant
341
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
19
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
Show annotations
View images
View plain text
Grant No. 209-3007 <br /> Delta Ponds Habitat Restoration <br /> EXHIBIT D <br /> POST-IMPLEMENTATION STATUS REPORT REQUIREMENTS <br /> Oregon Administrative Rule 695-010-0100(2) states that "Grantee will monitor the long-term <br /> effectiveness of the project, and continue its maintenance, submitting periodic reports on a <br /> schedule set by the Board. All reports will be filed with the Board or at a location specified by <br /> the Board." <br /> A Post-Implementation Status Report must include the following elements: <br /> 1. An assessment of whether the project continues to meet the goals specified in the Grant <br /> Agreement. <br /> 2. A description of any maintenance or modifications made since project completion or since <br /> the last Status Report, whichever was last. <br /> 3. An accounting of any costs associated with project maintenance and reporting to the <br /> Board. <br /> 4. A summary of any public awareness or educational activities related to the project <br /> undertaken since project completion or since the last Status Report, whichever was last. <br /> 5. Lessons learned from the project. <br /> Unless otherwise specified, the Grantee will provide color photos of all project elements (i.e., <br /> fencing, planting, or structures) to show compliance of the project with the Board funding <br /> decision. Photo points will be set up, and the color photographs should be taken with the <br /> same focal-length lens at the same time of year, showing conditions before and after project <br /> completion. Guidelines for photo point documentation are provided on the OWEB website <br /> at: http://www.oweb.state.o~.us/OWES/dots/pubs/PhotoPoint Monitoring Doc Ju1y2007.t~df. <br /> Photos must be taken: <br /> 1. At the same location as photographs from before project implementation (see Exhibit C); <br /> 2. Upon project completion; and <br /> 3. For each year the Board requires a Status Report. (See reporting requirements for this <br /> grant in Section J.) <br /> NOTE: See Exhibit B for any Special Conditions applying to the Post-Implementation <br /> Status Report. <br /> <br /> 07-09 Capita108.01.08.doc 11 <br /> <br />
The URL can be used to link to this page
Your browser does not support the video tag.