Lane County <br />Report ID: LBILLOOI BILLABLE PROJECT COSTS Page No. 1 <br />Run Date 07/21/201 I <br />Run Time 11:59:17 <br />Billable Project Costs for Fiscal Period 2011 -06A Period begins 06/01/2011 and ends including 06/30/2011 <br />Project: 36644609 AC Mix Verifl Billable HOLD Overhead Rates Applied for this project: Federal (Where applicable) <br />Billed By: 3636213 Materials Testing Proi: 36644609 <br />P4135 -Mix design <br />TranDate <br />TrsnlD <br />Resource Employed <br />Qty <br />Amount <br />Overhead <br />Transaction Remark <br />05/17/2011 <br />LABOR <br />Engineering Technician 2 <br />2 <br />$46.28 <br />$61.45 <br />MIX DESIGN <br />05/23/2011 <br />LABOR <br />Sr Engineering Associate <br />2 <br />$60.68 <br />$80.57 <br />ESC DESIGNS <br />05/25/2011 <br />LABOR <br />Engineering Technician 2 <br />1 <br />$23.14 <br />$30.73 <br />AC MIX DESIGN <br />05/25/2011 <br />LABOR <br />Engineering Technician 3 <br />4 <br />$105.00 <br />$139.42 <br />ESC L2 1 /2" <br />05/25/2011 <br />LABOR <br />Sr Engineering Associate <br />2 <br />$60.68 <br />$80.57 <br />ESC DESIGNS <br />05/26/2011 <br />LABOR <br />Engineering Technician 2 <br />1 <br />$23.14 <br />$30.73 <br />AC MIX DESIGN <br />05 /26 /2011 <br />LABOR <br />Engineering Technician 2 <br />4 <br />$105.84 <br />$140.53 <br />ESC RICE/GMA <br />05/2612011 <br />LABOR <br />Engineering Technician <br />4 <br />$105.00 <br />$139.42 <br />ESC L21 /2" <br />05/26 /2011 <br />LABOR <br />Supervising Engineering Assoc <br />0.5 <br />$17.91 <br />$23.78 <br />WILD L3,1/2" <br />05/27 /2011 <br />LABOR <br />Sr Engineering Associate <br />2 <br />$60.68 <br />$80.57 <br />ESC DESIGNS <br />05/31 /2011 <br />LABOR <br />Engineering Technician 3 <br />2 <br />$52.50 <br />$69.71 <br />ESG L2 1/2 <br />05/31 /2011 <br />LABOR <br />Sr Engineering Associate <br />2 <br />$60.68 <br />$80.57 <br />ESG DESIGNS <br />06/01 /2011 <br />LABOR <br />Engineering Technician 3 <br />4 <br />$105.00 <br />$139.42 <br />ESG L2 1/2 <br />06/01 /2011 <br />LABOR <br />Sr Engineering Associate <br />4 <br />$121.36 <br />$161.14 <br />ESG DESIGNS <br />06/02/2011 <br />LABOR <br />Engineering Technician 2 <br />1.5 <br />$36.38 <br />$48.31 <br />MIX DESIGN <br />06/02/2011 <br />LABOR <br />Sr Engineering Associate <br />2 <br />$60.68 <br />$80.57 <br />ESG DESIGNS <br />06/03/2011 <br />LABOR <br />Sr Engineering Associate <br />1 <br />$30.34 <br />$40.29 <br />ESG DESIGNS <br />P4135 Totals <br />$ 1075.29 <br />$ 1427.78 <br />$ 2503.07 <br />3636213 Materials Testine Total S 2503.07 <br />36644609 Project Grand Total $ 2503.07 <br />