Run Date: 08/09/2011 14:40:13 <br />Contractor: WILDISH CONSTRUCTION <br />Job #: 93- 004682 <br />Contract No: 2011 -00015 <br />PO #: 2011100427 <br />Assessable: No <br />Line Desc <br />City of Eugene <br />Contract Preliminary Progress Payment <br />Payment No : 002 <br />Original Contract: $1,533,794.50 <br />Current Amount: $1,533,794.50 <br />Contract Award Date: 06/03/2011 <br />Completion Date: 11/01/2011 <br />Current Contract Estimated Payment Cumulative Totals <br />Last Chng Ord Unit Price Unit Measure Quantity Amount Quantity Amount Quantity Amount <br />Page 3 <br />% Complete <br />0250 <br />MH FRAME /COVER - WW <br />$350.00 <br />EACH <br />3.000 <br />$1,050.00 <br />0.000 <br />$0.00 <br />0.000 <br />$0.00 <br />0.00 <br />0260 <br />10" STORM DRAIN PIPE <br />$50.00 <br />FT <br />163.000 <br />$8,150.00 <br />78.700 <br />$3,935.00 <br />78.700 <br />$3,935.00 <br />48.00 <br />0270 <br />10" STORM DRAIN PIPE, C900 <br />$50.00 <br />FT <br />182.000 <br />$9,100.00 <br />202.200 <br />$10,110.00 <br />202.200 <br />$10,110.00 <br />111.00 <br />0280 <br />12" STORM DRAIN PIPE <br />$100.00 <br />FT <br />38.000 <br />$3,800.00 <br />0.000 <br />$0.00 <br />0.000 <br />$0.00 <br />0.00 <br />0290 <br />CONNECT TO EXST PIPE <br />$250.00 <br />EACH <br />9.000 <br />$2,250.00 <br />9.000 <br />$2,250.00 <br />9.000 <br />$2,250.00 <br />100.00 <br />0300 <br />CONNECTION TO EXISTING STRUCTU <br />$500.00 <br />EACH <br />10.000 <br />$5,000.00 <br />5.000 <br />$2,500.00 <br />5.000 <br />$2,500.00 <br />50.00 <br />0310 <br />INSTALL CONCRETE INLET, 4A <br />$1,500.00 <br />EACH <br />14.000 <br />$21,000.00 <br />6.000 <br />$9,000.00 <br />6.000 <br />$9,000.00 <br />43.00 <br />0320 <br />CONCRETE CB WITH BIKE PROOF GR <br />$1,200.00 <br />EACH <br />2.000 <br />$2,400.00 <br />2.000 <br />$2,400.00 <br />2.000 <br />$2,400.00 <br />100.00 <br />0330 <br />WATER QUALITY MANHOLE <br />$25,000.00 <br />EACH <br />1.000 <br />$25,000.00 <br />0.000 <br />$0.00 <br />0.000 <br />$0.00 <br />0.00 <br />0340 <br />8" PVC WASTEWATER PIPE <br />$130.00 <br />FT <br />41.000 <br />$5,330.00 <br />39.000 <br />$5,070.00 <br />39.000 <br />$5,070.00 <br />95.00 <br />0350 <br />ADJUSTING BOXES <br />$150.00 <br />EACH <br />38.000 <br />$5,700.00 <br />10.000 <br />$1,500.00 <br />10.000 <br />$1,500.00 <br />26.00 <br />0360 <br />'Adjust Clean Out <br />$150.00 <br />EACH <br />4.000 <br />$600.00 <br />0.000 <br />$0.00 <br />0.000 <br />$0.00 <br />0.00 <br />0370 <br />LEVEL 3, 1/2" DENSE WMAC <br />$60.00 <br />TON <br />4,400.000 <br />$264,000.00 <br />1,105.790 <br />$66,347.40 <br />1,105.790 <br />$66,347.40 M <br />25.00 <br />0380 <br />LEVEL 1, 1/2" DENSE WMAC <br />$60.00 <br />TON <br />1,250.000 <br />$75,000.00 <br />380.150 <br />$22,809.00 <br />380.150 <br />$22,809.00 <br />30.00 <br />0390 <br />EXTRA FOR ASPHALT APPROACHES <br />$350.00 <br />EACH <br />3.000 <br />$1,050.00 <br />0.500 <br />$175.00 <br />0.500 <br />$175.00 <br />17.00 <br />0400 <br />PLAIN CONCRETE PAVEMENT,. 9" TH <br />$6.00 <br />SQFT <br />2,408.000 <br />$14,448.00 <br />2,606.000 <br />$15,636.00 <br />2,606.000 <br />$15,636.00 <br />108.00 <br />0410 <br />PLAIN CONCRETE PAVEMENT 12" TH <br />$10.00 <br />SQFT <br />3,224.000 <br />$32,240..00 <br />0.000 <br />$0.00 <br />0.000 <br />$0.00 <br />0.00 <br />0420 <br />CONCRETE CURB AND GUTTER <br />$11.00 <br />FOOT <br />5,880.000 <br />$64,680.00 <br />1,965.900 <br />$21,624.90 <br />1,965.900 <br />$21,624.90 <br />33.00 <br />0430 <br />CONCRETE CURB, VARIABLE HEIGHT <br />$20.00 <br />FT <br />460.000 <br />$9,200.00 <br />33.000 <br />$660.00 <br />33.000 <br />$660.00 <br />7.00 <br />0440 <br />CONCRETE CURB STANDARD <br />$40.00 <br />FT <br />32.000 <br />$1,280.00 <br />36.000 <br />$1,440.00 <br />36.000 <br />$1,440.00 <br />113.00 <br />0450 <br />CONCRETE VALLEY GUTTER <br />$25.00 <br />FT <br />800.000 <br />$20,000.00 <br />738.500 <br />$18,462.50 <br />738.500 <br />$18,462.50 <br />92.00 <br />0460 <br />4" CONC WALK <br />$6.00 <br />SQFT <br />12,710.000 <br />$76,260.00 <br />1,991.200 <br />$11,947.20 <br />1,991.200 <br />$11,947.20 <br />16.00 <br />0470 <br />7" CONCRETE DRIVEWAY <br />$10.00 <br />SQFT <br />4,652.000 <br />$46,520.00 <br />932.300 <br />$9,323.00 <br />932.300 <br />$9,323.00 <br />20.00 <br />0480 <br />TRUNCATED DOMES <br />$15.00 <br />SQFT <br />410.000 <br />$6,150.00 <br />30.000 <br />$450.00 <br />30.000 <br />$450.00 <br />7.00 <br />0490 <br />THERMOPLASTIC, NON- PROFILE, 90 <br />$12,000.00 <br />LUMPSUM <br />1.000 <br />$12,000.00 <br />0.000 <br />$0.00 <br />0.000 <br />$0.00 <br />0.00 <br />0500 <br />YELLOW CURB PAINT <br />$2.00 <br />FT <br />103.000 <br />$206.00 <br />0.000 <br />$0.00 <br />0.000 <br />$0.00 <br />0.00 <br />